Silicosis in the iron-ore mine in Kiruna, Sweden, and the future need for silicosis control

1986 ◽  
Vol 58 (4) ◽  
pp. 251-257 ◽  
Author(s):  
Harold Sihm J�rgensen
Keyword(s):  
Iron Ore ◽  
Author(s):  
S. Gyamfi ◽  
A. Halim ◽  
A. Martikainen

AbstractThis paper outlines a unique case of the development of strategies to reduce ventilation and heating costs in Konsuln iron ore mine in northern Sweden. The mine, located just south of Luossavaara-Kiirunavaara Aktiebolag’s Kiruna iron ore mine, was developed as a test mine 2018–2020 for the Sustainable Underground Mining (SUM) project. Besides functioning as a test mine, Konsuln also contributes ore production. The existing mine ventilation system was designed for the current production rate of 0.8 million tons per annum (Mtpa). There is a plan to increase this rate to between 1.8 and 3 Mtpa in the future, and this requires the primary fans to be upgraded. Therefore, a study was carried out to determine whether using ventilation on demand (VOD) could avoid this fan upgrade and reduce Konsuln’s ventilation and heating power costs in the future. The study also investigated whether using battery electric vehicles (BEVs) along with VOD or as a standalone strategy could further reduce these power costs. In addition, the study analyzed the suitability of heating power reduction strategies presently or previously used in the Nordic countries and Canada to investigate potential additional strategies to reduce the heating power cost, the largest portion of Konsuln’s ventilation and heating power costs. The study found using VOD can avoid the expensive upgrading of the existing primary fans and reduce Konsuln’s ventilation and heating power costs in the future. Using BEVs can further reduce these costs. Finally, none of the Nordic and Canadian heating power reduction strategies is suitable for Konsuln because they require unique conditions that do not exist in Konsuln.


2011 ◽  
Vol 21 (6) ◽  
pp. 781-786 ◽  
Author(s):  
Maowei Ji ◽  
Xiaojing Li ◽  
Shunchuan Wu ◽  
Yongtao Gao ◽  
Linlin Ge

2021 ◽  
Vol 4 ◽  
pp. 1-8
Author(s):  
R.A. Adebimpe ◽  
A.O. Fatoye

Knowledge of tailings characteristics is required for utilisation and management purposes in the mining and construction industry. Tailings from the mine waste dumps at Itakpe iron ore mine were collected and analysed in the laboratory to determine their chemical and physical characteristics and these include; permeability, porosity, specific gravity, particle size distribution, chemical composition and bioavailability factor of element. Geochemical speciation with quantitative X-ray powder diffraction was used to evaluate the chemical and mineral composition of Itakpe iron ore tailings. The aim is to offer base line data necessary to assess metal mobility and bioavailability. The distribution of heavy metals such as Cu, Ni, Cd, Cr, Zn and Fe was determined using multi- step sequential extraction. The results obtained indicate that the permeability is 6.24 x 10-3 cm/sec; porosity is 35%; and specific gravity is 3.58. The tailings is well graded and is sand gravel. Nickel and Zinc was found to be considerably high in exchangeable and bound to carbonates fraction which are mobile region and is bound to Fe – Mn oxides which is slightly mobile region but the higher concentration of Ni found in residual fraction. The implication of this result is that Nickel and Zinc partially enter into the food chain. Chromium and Cadmium concentration result indicated that these metals can easily enter into the food chain because of their presence in the mobile region and their higher mobility percentage.


2021 ◽  
Vol 18 (1) ◽  
pp. 32-44
Author(s):  
Abdolhakim Batajrobeh Rudi ◽  
Mohsen Mohammadnia Ahmadi ◽  
Mehdi Mogharnasi ◽  
◽  
◽  
...  

Author(s):  
Amirhossein Najafabadipour ◽  
Gholamreza Kamali ◽  
Hossein Nezamabadi-pour

The Forecasting of Groundwater Fluctuations is a useful tool for managing groundwater resources in the mining area. Water resources management requires identifying potential periods for groundwater drainage to prevent groundwater from entering the mine pit and imposing high costs. In this research, Auto-Regressive Integrated Moving Average (ARIMA) and Holt-Winters Exponential Smoothing (HWES) data-driven models were used for short-term modeling of the groundwater fluctuations in a piezometer around the Gohar Zamin Iron Ore Mine. For this purpose, 250 non-seasonal groundwater fluctuations data in the period 22-Nov-2018 to 29-Jul-2019, 200 data for modeling, and 50 data for prediction were used. To take advantage of all the features of the two developed models, the predictions are combined with different methods and specific weights. The results show better accuracy for the ARIMA method between the two short-term forecasts, while the HWES method requires less time for modeling. Also, among all the predictions made, the highest accuracy for the combined least-squares method is for forecasting the groundwater fluctuations in the short-term. All the forecasts show a decrease in the groundwater fluctuations, indicating pumping wells around the Gohar Zamin Iron Ore Mine area.


2008 ◽  
Vol 52 (1) ◽  
pp. S43-S50 ◽  
Author(s):  
Malcolm Ross ◽  
Robert P. Nolan ◽  
Gordon L. Nord

Sign in / Sign up

Export Citation Format

Share Document