Cycle time variance minimization in dynamic scheduling of single machine systems

2008 ◽  
Vol 42 (5-6) ◽  
pp. 544-552 ◽  
Author(s):  
Amit Kumar Gupta ◽  
Viswanath Kumar Ganesan ◽  
Appa Iyer Sivakumar
1990 ◽  
Vol 41 (8) ◽  
pp. 767-779 ◽  
Author(s):  
M. C. Gupta ◽  
Y. P. Gupta ◽  
C. R. Bector

1990 ◽  
Vol 41 (8) ◽  
pp. 767 ◽  
Author(s):  
M. C. Gupta ◽  
Y. P. Gupta ◽  
C. R. Bector

Author(s):  
S. Zhou ◽  
X. Cai

AbstractThe completion-time variance (CTV) and the waiting-time variance (WTV) are two performance measures which are commonly used in optimization of single-machine scheduling systems. This paper shows that when the number of jobs is large the two measures are nearly equivalent in a probabilistic environment.


Sign in / Sign up

Export Citation Format

Share Document