scholarly journals Concurrent operation of 10 gyrotrons at W7-X experience and improvement opportunities

2018 ◽  
Vol 187 ◽  
pp. 01003 ◽  
Author(s):  
H. Braune ◽  
K.J. Brunner ◽  
H.P. Laqua ◽  
S. Marsen ◽  
D. Moseev ◽  
...  

At the stellarator Wendelstein 7-X (W7-X) Electron Cyclotron Resonance Heating (ECRH) is the main heating system for steady-state operation and was the only available heating system during the operation phase OP1.2a in 2017. The ECRH, equipped with 10 operational 140 GHz gyrotrons [1], was used for different tasks at W7-X such as wall conditioning, controlled plasma start-up from the neutral gas up to steady state plasma control and different heating scenarios such as X2-mode and O2-mode heating as well as current drive (ECCD). The operational experiences and improvement opportunities of the ECRH plant will be discussed.

2015 ◽  
Vol 43 (1) ◽  
pp. 485-489 ◽  
Author(s):  
Braj Kishore Shukla ◽  
Paresh J. Patel ◽  
Jatin Patel ◽  
Rajan Babu ◽  
Harshida Patel ◽  
...  

2009 ◽  
Vol 11 (5) ◽  
pp. 619-624 ◽  
Author(s):  
Zhang Guoqing ◽  
Kazunobu Nagasaki ◽  
Zhou Jun ◽  
Wang He ◽  
Huang Mei ◽  
...  

2006 ◽  
Vol 45 (10A) ◽  
pp. 7911-7913 ◽  
Author(s):  
Yoshinori Tatematsu ◽  
Norihito Machida ◽  
Teruo Saito ◽  
Kiyoshi Nozaki ◽  
Daichi Nagai ◽  
...  

2007 ◽  
Vol 52 (2) ◽  
pp. 313-320 ◽  
Author(s):  
Dietmar Wagner ◽  
Fritz Leuterer ◽  
Adriano Manini ◽  
Francesco Monaco ◽  
Max Münich ◽  
...  

2014 ◽  
Vol 21 (6) ◽  
pp. 061506 ◽  
Author(s):  
H. Takahashi ◽  
T. Shimozuma ◽  
S. Kubo ◽  
Y. Yoshimura ◽  
H. Igami ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document