Co-Recycling of Sludge and Municipal Solid Waste: A Cost-Benefit Analysis

1998 ◽  
Vol 19 (12) ◽  
pp. 1163-1175 ◽  
Author(s):  
E. P. Butt ◽  
G. K. Morse ◽  
J. A. Guy ◽  
J. N. Lester
2014 ◽  
Vol 16 (01) ◽  
pp. 1450001 ◽  
Author(s):  
LORIS ALEXANDER MANNI ◽  
HENS A. C. RUNHAAR

The efficient management of waste is important in order to reduce negative externalities, such as air, water and soil pollution. A major challenge is the increasing amount of municipal solid waste (MSW) produced by households. Municipalities around the world have implemented pay-as-you-throw (PAYT) schemes in order to incentivise the reduction of MSW. Although the literature has shown that these financial incentive schemes are often effective, they are criticised in practice for raising costs to society. This paper aims to assess whether or not this criticism is correct. A social cost-benefit analysis was conducted in order to take into account economic, environmental and social costs and benefits. Our results show that PAYT schemes reduce overall social costs and therefore positively contribute to the social efficiency of a municipality. The above criticism is not supported by empirical evidence, but in practice forms a barrier to the implementation of PAYT schemes. In order to remove this barrier, we encourage the readers of JEAPM to disseminate our findings to a wider audience.


1995 ◽  
Vol 14 (2) ◽  
pp. 103-131 ◽  
Author(s):  
Aung May Tin ◽  
Donald L. Wise ◽  
Wei-Han Su ◽  
Lars Reutergardh ◽  
Seong-Key Lee

2021 ◽  
Vol 6 (1) ◽  
Author(s):  
Arlina Phelia ◽  
Ria Oktaviani Sinia

Bandar Lampung City is part of the major city of Lampung province. The problem that arises in Bandar Lampung City is solid waste management. The amount of solid waste in Bandar Lampung City reaches 1000 tons/day. One of the district  of Bandar Lampung named Kedamaian district still uses the old method (collecting-transport-throw) in solid waste management, which  causes the load of waste to accumulate in the landfill. The constraints encountered  this time are the absence of sorting locations  and limited land. Kedamaian district needs to develop waste  treatment facilities, an approach based on  Cost Benefit Analysis (CBA). The results show  from the analysis that BCR in the scenario A <1 is 0.85 with NPV - Rp. 72.968.828. the  activity in the existing conditions can still be carried out, but the waste reduction has not been maximized to the TPS (Container). Scenario B, NPV is Rp. 95.319.338 and BCR is 1.13, which value of BCR is >1. This indicates that a waste processing facility  in the Kedamaian District is suitable to  operate  with TPS-3R. The results of scenario B are  obtained by increasing the effectiveness of processing facilities to 100% by  2025. In 2025, with the implementation of the TPS-3R obtained, BCR is 1.20 with NPV is Rp. 218.447.621.


Sign in / Sign up

Export Citation Format

Share Document