A two-stage assembly flow-shop scheduling problem with bi-level products structure and machines’ availability constraints
Keyword(s):
2010 ◽
Vol 37
(5)
◽
pp. 960-969
◽
Keyword(s):
2013 ◽
Vol 28
(3)
◽
pp. 358-368
◽
Keyword(s):
2004 ◽
Vol 153
(3)
◽
pp. 534-543
◽
Keyword(s):
2019 ◽
Vol 52
(3)
◽
pp. 484-506
◽
Keyword(s):
2014 ◽
Vol 73
(5-8)
◽
pp. 601-611
◽
Keyword(s):
2013 ◽
Vol 51
(12)
◽
pp. 3625-3642
◽
Keyword(s):
2015 ◽
Vol 54
(4)
◽
pp. 963-983
◽
Keyword(s):
2019 ◽
Vol 52
(6)
◽
pp. 1009-1036
◽