Large-scale tidal power development in the Bay of Fundy has been given serious consideration for over 60 years. There has been a long history of productive interaction between environmental scientists and engineers durinn the many feasibility studies undertaken. Up until recently, tidal power proposals were dropped on economic grounds. However, large-scale development in the upper reaches of the Bay of Fundy now appears to be economically viable and a pre-commitment design program is highly likely in the near future. A large number of basic scientific research studies have been and are being conducted by government and university scientists. Likely environmental impacts have been examined by scientists and engineers together in a preliminary fashion on several occasions. A full environmental assessment will be conducted before a final decision is made and the results will definately influence the outcome.