Two stage activated sludge plants – influence of different operational modes on sludge bulking and nitrification

2002 ◽  
Vol 46 (1-2) ◽  
pp. 479-486 ◽  
Author(s):  
G. Wandl ◽  
H. Müller-Rechberger ◽  
N. Matsché ◽  
K. Svardal ◽  
S. Winkler

Conventional two stage activated sludge plants often lack sufficient nutrient removal performance due to substrate limitation for denitrification in the second stage. For the extension of the Vienna Main WWTP a two stage concept has been developed and tested by means of a pilot plant (scale 1:10.000). The new concept enables the operation of two different modes: In BYPASS-mode a portion of the primary clarifier effluent is fed directly to the second stage; the HYBRID-mode includes the exchange of mixed liquor between the two stages; over the course of the pilot plant investigations it turned out that nutrient removal is strongly increased in comparison to conventional two stage mode, but the two modes of operation lead to different results with regard to the sludge quality and the nitrification performance. BYPASS mode yields a higher SVI in both stages and a lower nitrification performance in comparison to HYBRID mode. This is caused by the negative influence of the primary effluent on the biocoenosis of the second stage. Additionally, the reduced sludge loading of the first stage in this mode results in a higher sludge age which favours the growth of filaments (Microthrix and Nocardia). In HYBRID-mode the higher load of the first stage results in a lower sludge age, fatty components are metabolized and incorporated in the sludge, thus, the growth of filaments is significantly reduced. Additionally, nitrification inhibiting substances are degraded in the first stage, which results in a higher nitrification performance in the second stage.

2006 ◽  
Vol 53 (8) ◽  
pp. 149-157 ◽  
Author(s):  
S. Watts ◽  
G. Hamilton ◽  
J. Keller

A two-stage thermophilic-mesophilic anaerobic digestion pilot-plant was operated solely on waste activated sludge (WAS) from a biological nutrient removal (BNR) plant. The first-stage thermophilic reactor (HRT 2 days) was operated at 47, 54 and 60 °C. The second-stage mesophilic digester (HRT 15 days) was held at a constant temperature of 36–37 °C. For comparison with a single-stage mesophilic process, the mesophilic digester was also operated separately with an HRT of 17 days and temperature of 36–37 °C. The results showed a truly thermophilic stage (60 °C) was essential to achieve good WAS degradation. The lower thermophilic temperatures examined did not offer advantages over single-stage mesophilic treatment in terms of COD and VS removal. At a thermophilic temperature of 60 °C, the plant achieved 35% VS reduction, representing a 46% increase compared to the single-stage mesophilic digester. This is a significant level of degradation which could make such a process viable in situations where there is no primary sludge generated. The fate of the biologically stored phosphorus in this BNR sludge was also investigated. Over 80% of the incoming phosphorus remained bound up with the solids and was not released into solution during the WAS digestion. Therefore only a small fraction of phosphorus would be recycled to the main treatment plant with the dewatering stream.


2001 ◽  
Vol 44 (1) ◽  
pp. 137-144 ◽  
Author(s):  
H. Müller-Rechberger ◽  
G. Wandl ◽  
S. Winkler ◽  
K. Svardal ◽  
N. Matsché

A pilot plant has been operated over a period of two years in order to investigate the performance and the operating characteristics of the plant concept developed for the extension of the main Vienna STP and to develop a simulation model which will be applied for operation support of the full stage plant. The pilot plant is a two stage activated sludge plant, each stage comprising of four aeration tanks and a clarifier tank. The pilot plant layout allows three different operational modes, each of which has been operated for several periods. The performance of the pilot plant during these periods is described and the different operational modes are compared to each other.


2021 ◽  
pp. 1-11
Author(s):  
Tianhong Dai ◽  
Shijie Cong ◽  
Jianping Huang ◽  
Yanwen Zhang ◽  
Xinwang Huang ◽  
...  

In agricultural production, weed removal is an important part of crop cultivation, but inevitably, other plants compete with crops for nutrients. Only by identifying and removing weeds can the quality of the harvest be guaranteed. Therefore, the distinction between weeds and crops is particularly important. Recently, deep learning technology has also been applied to the field of botany, and achieved good results. Convolutional neural networks are widely used in deep learning because of their excellent classification effects. The purpose of this article is to find a new method of plant seedling classification. This method includes two stages: image segmentation and image classification. The first stage is to use the improved U-Net to segment the dataset, and the second stage is to use six classification networks to classify the seedlings of the segmented dataset. The dataset used for the experiment contained 12 different types of plants, namely, 3 crops and 9 weeds. The model was evaluated by the multi-class statistical analysis of accuracy, recall, precision, and F1-score. The results show that the two-stage classification method combining the improved U-Net segmentation network and the classification network was more conducive to the classification of plant seedlings, and the classification accuracy reaches 97.7%.


2003 ◽  
Vol 47 (11) ◽  
pp. 115-122 ◽  
Author(s):  
J. Manga ◽  
J. Ferrer ◽  
A. Seco ◽  
F. Garcia-Usach

A mechanistic mathematical model for nutrient and organic matter removal was used to describe the behavior of a nitrification denitrification enhanced biological phosphorus removal (NDEBPR) system. This model was implemented in a user-friendly software DESASS (design and simulation of activated sludge systems). A 484-L pilot plant was operated to verify the model results. The pilot plant was operated for three years over three different sludge ages. The validity of the model was confirmed with data from the pilot plant. Also, the utility of DESASS as a valuable tool for designing NDEBPR systems was confirmed.


1992 ◽  
Vol 25 (4-5) ◽  
pp. 427-428 ◽  
Author(s):  
R. Schulze-Rettmer ◽  
S. S. Kim ◽  
S. S. Son

The two-stage activated sludge process (AB-process, i.e. adsorption activated sludge process) invented by Boehnke was successfully applied to several municipal and industrial wastewaters in Korea. The first large wastewater treatment plant for the combined effluents of 22 textile dyeing companies was constructed in Taegu and started operation in 1989. Two years earlier pilot plant runs were performed. The AB-process proved to be superior to any other activated sludge process. BOD was reduced from 1200 mg/l down to 24 mg/l. In the meantime in Korea several further AB-process treatment plants were constructed, the overall planning and constructing period being not longer than one year.


2013 ◽  
Vol 63 (3) ◽  
Author(s):  
Lubomír Kubáček

AbstractIf a regression experiment is realized in two stages, then two possibilities can occur in the second stage. Estimates of the first stage parameters either may be corrected by use of second stage measurements or they must stay unchanged. In the latter case, this requirement must be taken into account when estimating the second stage parameters. The situation is a little more complicated when constraints on both groups of parameters are imposed.


1995 ◽  
Vol 32 (9-10) ◽  
pp. 95-104 ◽  
Author(s):  
A. D. Andreadakis ◽  
G. Kondili ◽  
D. Mamais ◽  
A. Noussi

The cyclic or sequencing batch activated sludge process was applied for the treatment of septage originating from cesspools serving non-sewered areas. Single and two stage systems were investigated in bench scale units. The single stage aerated system was capable in removing practically all the biodegradable COD and producing a well stabilised excess sludge with excellent settling and thickening characteristics. With respect to nitrogen the average removal rate was to the order of 70%, but the performance was unstable due to periodic strong inhibition of the nitrification process. Subsequent treatment in a second stage aerated unit improved nitrification but did not result in higher nitrogen removal rates due to the increased concentrations of oxidised nitrogen. An anoxic second stage post denitrification unit resulted in an overall nitrogen removal of 88%, through a substantial reduction of nitrates. Further improvement of the system, with nitrogen removal of about 95% and average effluent nitrogen concentrations lower than 10 mg.1−1, can be achieved by adoption of a two stage system consisting of a first aerated stage unit, followed by a second stage unit with alternating aerated and anoxic cycles and addition of external carbon during the anoxic cycle.


2004 ◽  
Vol 50 (7) ◽  
pp. 147-155 ◽  
Author(s):  
S. Winkler ◽  
N. Natsché ◽  
T. Gamperer ◽  
M. Dum

The sewage-load variations in winter tourism areas are characterized by sudden increases - in the ange of a factor two to three - within only a few days at the start and the end of the tourist season, especially at Christmas. The sudden load increases occur during periods of low wastewater temperatures, which is an additional demanding factor with respect to nitrogen removal. A full case study was carried out at WWTP Saalfelden, which is located near one of Austria's largest skiing resorts. The plant is designed for 80,000 PE and built according to the HYBRID®-concept, which is a special two stage activated sludge process for extensive nutrient removal.


2004 ◽  
Vol 50 (7) ◽  
pp. 19-26 ◽  
Author(s):  
H. Kroiss ◽  
F. Klager ◽  
S. Winkler ◽  
G. Wandl ◽  
K. Svardal

The Main Treatment Plant of Vienna is in extension for 4 million p.e. and very stringent nutrient removal requirements. The existing high rate BOD removal activated sludge plant (in operation since 1980) is extended by a second stage activated sludge plant and a newly developed flow scheme for nitrogen removal optimisation adaptable to the temperature variations over the year. For this plant pilot investigations have been performed for the development of a specific mathematical model (ASMV) and a specific aeration control strategy. The civil work of the extension is already finished and the installation of the equipment has started. Operation should start in 2004. The whole project will cost about €264 million of which about one half is for civil work. The effluent standards correspond to the requirements for sensitive areas in EU Directive for Municipal Waste Water. The raw primary and excess sludge are incinerated after thickening and dewatering. This paper tries to condense the already existing literature with the construction progress and the cost situation.