Activated sludge wastewater treatment plants optimisation to face pollution overloads during grape harvest periods

2005 ◽  
Vol 51 (1) ◽  
pp. 81-88 ◽  
Author(s):  
C. Beck ◽  
G. Prades ◽  
A.-G. Sadowski

The principal objective of our study was to optimise a municipal activated sludge wastewater treatment plant (WWTP) to face high organic flows due to viticulture effluents inputs. Treatment file optimization consisted in testing different treatment lines, changing the number and volume of biological basins and clarifiers, with or without a buffer basin upstream, with a view to achieving a better reduction of COD. The actual WWTP biological stage is composed of two aerated basins whose total volume is 1365 m3. The studied cases are successively, the installation of a single basin of 1365 m3, then of several basins whose total volume remains constant and equal to 1365 m3. Another case was also considered, that of an aerated basin followed by a first clarifier and then, by another aerated basin and a second clarifier. All scenarios presented below were evaluated, for standard dry weather conditions and for high organic load conditions, as encountered during the grape harvest period. The method used was to carry out various simulations, using numerical modelling, and to compare the impact of different process line scenarios and management strategies on the activated sludge WWTP efficiencies.

Processes ◽  
2020 ◽  
Vol 8 (5) ◽  
pp. 598 ◽  
Author(s):  
Tomáš Vítěz ◽  
Monika Vítězová ◽  
Markéta Nováčková ◽  
Ivan Kushkevych

Ensuring high quality drinking water sources is important task nowadays. To reach this task, knowledge about the impact of different chemicals on aerobic wastewater treatment is mandatory. A mixture of different chemicals reaches wastewater treatment plant every day. With the growing discharge volume of mobile toilet chemicals, active substances in these products in the past years have been recorded. The respiratory activity of activated sludge was determined to show how mobile toilet chemicals and their active substances may affect the biological wastewater treatment process. The results show negative effect of formaldehyde and bronopol on respiratory activity of activated sludge. The wastewater treatment plants influent composition and size also play important roles. Results shows that activated sludge microorganisms at a wastewater treatment plant in industrial urban area may be adapted to the higher pollutants concentration. When mobile toilet tanks are directly discharged at smaller wastewater treatment plant, an activated sludge process can be affected. For treating mobile toilet wastewater, bacterial degraders can be used. During our respiratory activity experiments, potential degraders were searched. Ralstonia sp. prevails in all samples and it is therefore a potential mobile toilet chemicals degrader.


1999 ◽  
Vol 40 (11-12) ◽  
pp. 223-229 ◽  
Author(s):  
Frédéric Clauss ◽  
Christel Balavoine ◽  
Delphine Hélaine ◽  
Gaëtan Martin

Forest industry wastewaters are difficult to clean: hydraulic and organic load variations, filamentous bulking or pin-point flocs negatively impact depollution processes. The addition of a fine, mineral, talc-based powder, Aquatal, into the aeration tanks of wastewater treatment plants connected to pulp and paper factories has been successfully tested since end of '97. The first case-study presents full results obtained over a period of 18 months in a 20,000 p.e. plant connected to a paper factory. The mineral powder was regularly added to control sludge volume index, thereby ensuring low suspended solids concentration in the outfluent. Plant operators could easily adapt biomass concentration to match organic load variation, thereby maintaining pollution micro-organisms ratio constant. In a second case study, a trouble-shooting strategy was implemented to counteract filamentous bulking. A one-off, large dosage enabled the plant operator to deal effectively with poor settleability sludge and rapidly control sludge blanket expansion. In both cases, the main common characteristics observed were an increase in floc aggregation and the production of heavier and well-structured flocs. The sludge settling velocity increased and an efficient solid/liquid separation was obtained. After a few days, the mineral particles of Aquatal were progressively integrated into the sludge floc structure. When the mineral powder was added to the activated sludge in the aeration basin, chemical interactions frequently encountered with other wastewater treatment additives did not pose a problem. Moreover, with this mineral additive, the biological excess sludge displayed good thickening properties and dewatering was improved. Despite the addition of the insoluble mineral particles, the amount of wet sludge expelled did not increase. Aquatal offers a rapid solution to floc settleability problems which so frequently arise when physical or biological disorders appear in forest industry wastewater treatment plants.


1994 ◽  
Vol 30 (2) ◽  
pp. 165-174 ◽  
Author(s):  
Ralf Otterpohl ◽  
Thomas Rolfs ◽  
Jörg Londong

Computer simulation of activated sludge plant for nitrogen removal has become a reliable tool to predict the behaviour of the plant Models including biological phosphorus removal still require some practical experience but they should be available soon. This will offer an even wider range than today's work with nitrogen removal. One major benefit of computer simulation of wastewater treatment plants (WTP) is the optimization of operation. This can be done offline if hydrographs of a plant are collected and computer work is done with “historical” analysis. With online simulation the system is fed with hydrographs up to the actual time. Prognosis can be done from the moment of the computer work based on usual hydrographs. The work of the authors shows how accuratly a treatment plant can be described, when many parameters are measured and available as hydrographs. A very careful description of all details of the special plant is essential, requiring a flexible simulation tool. Based on the accurate simulation a wide range of operational decisions can be evaluated. It was possible to demonstrate that the overall efficiency in nitrogen removal and energy consumption of ml activated sludge plant can be improved.


Water ◽  
2020 ◽  
Vol 12 (10) ◽  
pp. 2657
Author(s):  
Elwira Nowobilska-Majewska ◽  
Piotr Bugajski

The aim of this study was to determine the condition of activated sludge in the biologic reactor located in the collective wastewater treatment plant in Nowy Targ (Poland) based on OUR tests in the aspect of the impact of sludge’s concentration in the biologic reactor and dependence of BOD5/TN and BOD5/TP in wastewater flowing into the biologic reactor. The analysis was conducted based on test results from 61 samples of activated sludge taken from the biologic reactor and 61 samples of wastewater flowing into the biologic reactor. The analysis included the concentration of sludge in the biologic reactor. The following indicators were analyzed in wastewater flowing into the reactor: biochemical oxygen demand (BOD5), total nitrogen (TN) and total phosphorus (TP). The statistical analysis concerning the impact of the analyzed factors on oxygen uptake rate (OUR) tests was developed based on the Pearson’s correlation coefficient and partial correlation of many variables. Based on the results of the partial correlation analysis, nomograms were developed to determine the condition of activated sludge microorganisms (OUR) based on the BOD5/TN and BOD5/TP connection and knowledge of the sludge concentration in the bioreactor of the treatment plant. The presented nomograms can be formulated for each bioreactor based on activated sludge technology related the load of organic and biogenic pollutants in the wastewater flowing into the bioreactor and the concentration of the sludge in the bioreactor.


2004 ◽  
Vol 50 (6) ◽  
pp. 251-260 ◽  
Author(s):  
M.S. Moussa ◽  
A.R. Rojas ◽  
C.M. Hooijmans ◽  
H.J. Gijzen ◽  
M.C.M. van Loosdrecht

Computer modelling has been used in the last 15 years as a powerful tool for understanding the behaviour of activated sludge wastewater treatment systems. However, computer models are mainly applied for domestic wastewater treatment plants (WWTPs). Application of these types of models to industrial wastewater treatment plants requires a different model structure and an accurate estimation of the kinetics and stoichiometry of the model parameters, which may be different from the ones used for domestic wastewater. Most of these parameters are strongly dependent on the wastewater composition. In this study a modified version of the activated sludge model No. 1 (ASM 1) was used to describe a tannery WWTP. Several biological tests and complementary physical-chemical analyses were performed to characterise the wastewater and sludge composition in the context of activated sludge modelling. The proposed model was calibrated under steady-state conditions and validated under dynamic flow conditions. The model was successfully used to obtain insight into the existing plant performance, possible extension and options for process optimisation. The model illustrated the potential capacity of the plant to achieve full denitrification and to handle a higher hydraulic load. Moreover, the use of a mathematical model as an effective tool in decision making was demonstrated.


1994 ◽  
Vol 30 (4) ◽  
pp. 181-190 ◽  
Author(s):  
René Dupont ◽  
Ole Sinkjær

The objective of the work presented is to demonstrate how computer based models can be used to improve the effluent quality from wastewater treatment plants by optimisation of the operation. The investigation was carried out in connection with pilot plant investigations at Damhusllen Wastewater Treatment Plant in order to establish the design basis for upgrading the treatment plants in the city of Copenhagen. Calibration of the model was done with thorough characterisation of the wastewater and the activated sludge as the primary calibration tool. Special attention was paid to the nitrification process, which by previous investigations was shown to be occasionally inhibited. Model constants for the nitrification process were detennined from experiments. Default constants were used for nearly all other constants. The pilot plant was optimized with the calibrated model. Different operational strategies for improvement of the denitrification process were tested. The denitrification process was operated relatively poorly at the time for the optimisation. The calibration showed that it was possible to calibrate the model using the characterization of the wastewater and the activated sludge as the primary calibration tool. Further it was shown that the calihrated model could be used as a tool for optimising the operation of the pilot plant. The suggested operation correlated well with the practical realisable operation.


1997 ◽  
Vol 36 (11) ◽  
pp. 171-179 ◽  
Author(s):  
J. H. Rensink ◽  
W. H. Rulkens

Pilot plant experiments have been carried out to study the mineralization of sludge from biological wastewater treatment plants by worms such as Tubificidae. Trickling filters filled with lava slags were continuously fed with a certain quantity of excess activated sludge of a Dutch brewery wastewater treatment plant (Bavaria) by recirculation during 10 to 14 days. At the starting point of each experiment the trickling filters were inoculated with Tubificidae. Recirculation of sludge showed that use of Tubificidae resulted in a COD reduction of the sludge (mixed liquor) of 18–67–. Without worms this reduction was substantially lower. The sludge production in a pilot activated sludge system for treating settled domestic wastewater reduced from 0.40 to 0.15 g MLSS/g COD removed when Tubificidae were added to the system. The lower amounts of sludge were always accompanied by an increase of nitrate and phosphate concentration in the wastewater. There was no disturbance of the nitrification process. Application of Tubificidae or other worms may have interesting potential for practical application.


1992 ◽  
Vol 26 (3-4) ◽  
pp. 783-790
Author(s):  
J. Pedersen

A newly developed simulation program, based on the Activated Sludge Model No. 1, has been investigated for its controlling abilities. The program is capable of simulating most of the control types which have been applied to wastewater treatment plants. The program was tested on a nitrifying and a denitrifying treatment plant. The results showed that the model makes good simulations of the applied controls.


2020 ◽  
Vol 13 ◽  
pp. 117862212093585 ◽  
Author(s):  
Karim M Morsy ◽  
Mohamed K Mostafa ◽  
Khaled Z Abdalla ◽  
Mona M Galal

Although significant progress has been achieved in the field of environmental impact assessment in many engineering disciplines, the impact of wastewater treatment plants has not yet been well integrated. In light of this remarkable scientific progress, the outputs of the plants as treated water and clean sludge have become potential sources of irrigation and energy, not a waste. The aim of this study is to assess the environmental impacts of upgrading the wastewater treatment plants from primary to secondary treatment. The Lifecycle Assessment Framework (ISO 14040 and 14044) was applied using GaBi Software. Abu Rawash wastewater treatment plant (WWTP) has been taken as a case study. Two scenarios were studied, Scenario 1 is the current situation of the WWTP using the primary treatment units and Scenario 2 is upgrading the WWTP by adding secondary treatment units. The study highlighted the influence and cumulative impact of upgrading all the primary WWTPs in Egypt to secondary treatment. With the high amount of energy consumed in the aeration process, energy recovery methods were proposed to boost the circular economy concept in Abu Rawash WWTP in order to achieve optimal results from environmental and economic perspectives.


Sign in / Sign up

Export Citation Format

Share Document