scholarly journals Open-cycle heat pumps for industrial waste-heat utilization. Project technical report, May 12, 1980-October 10, 1980. Phase I. Feasibility study

1980 ◽  
Author(s):  
Energy Policy ◽  
2013 ◽  
Vol 62 ◽  
pp. 236-246 ◽  
Author(s):  
Hao Fang ◽  
Jianjun Xia ◽  
Kan Zhu ◽  
Yingbo Su ◽  
Yi Jiang

2012 ◽  
Vol 100 ◽  
pp. 229-237 ◽  
Author(s):  
D. Vuarnoz ◽  
A. Kitanovski ◽  
C. Gonin ◽  
Y. Borgeaud ◽  
M. Delessert ◽  
...  

Energies ◽  
2020 ◽  
Vol 13 (14) ◽  
pp. 3551 ◽  
Author(s):  
Pauli Hiltunen ◽  
Sanna Syri

The district heating operator Fortum and the city of Espoo have set a goal to abandon the use of coal in district heating production and increase the share of renewable sources to 95% by the year 2029. Among renewable fuels and heat pumps, waste heat utilization has an important role in Fortum’s plans for the decarbonization of district heating production, and Fortum is considering the possibility of utilizing waste heat from a large data center in its district heating network. The goal of this paper is to investigate the feasibility and required amount of waste heat to achieve this goal. Two different operation strategies are introduced—an operation strategy based on marginal costs and an operation strategy prioritizing waste heat utilization. Each strategy is modeled with three different electricity price scenarios. Because the low temperature waste heat from a data center must be primed by heat pumps, the electricity price has a significant impact on the feasibility of waste heat utilization. Prioritizing waste heat utilization leads to higher production costs, but a lower waste heat capacity is needed to reach the goal of 95% renewables in production. The higher electricity price emphasizes the differences between the two operation strategies. Waste heat utilization also leads to significant reductions of CO2 emissions.


2007 ◽  
Vol 11 (3) ◽  
pp. 165-172 ◽  
Author(s):  
Slavomir Smolen ◽  
Marzena Budnik-Rodz

The main aim of the following presentation is the comparison and evaluation of the conditions for waste heat utilization in Germany and in Poland. This paper presents synthetically the results of economic analysis of the different technical variants. The employment of heat pumps and other heat transformers, respectively, can reduce the energy consumption, but using of those technical possibilities depends mainly on the economic aspects. The main parameters of the financial calculations were the energy and equipment costs but beyond it a number of other factors were also considered and compared, for example calculation interests, profit tax level and similar. Four different technical alternatives were analyzed, it is using of absorption heat pump, compression heat pump, heat transformer (absorption), and a special combined system with gas motor to drive of heat pump compressor. The capital value as main result of the investigations is in Poland generally lower because of relatively high investment cost and lower energy prices compared to the situation in Germany and West Europe. The basis for the presented comparative analysis was an industrial project in Germany which effected in development of concepts for waste heat using. .


Sign in / Sign up

Export Citation Format

Share Document