Technical and economic limits to the application of the horizontal direction drilling method in the construction of underwater transitions of main pipelines
2017 ◽
Vol 7
(3)
◽
pp. 66-73
2019 ◽
pp. 141-152
2019 ◽
Vol 9
(3)
◽
pp. 342-352
2019 ◽
Vol 9
(1)
◽
pp. 46-55
2020 ◽
Vol 10
(4)
◽
pp. 386-393
2018 ◽
Vol 8
(3)
◽
pp. 254-263