The Empirical Identification and Analysis of Key Risk Factors of Inventory Financing

2012 ◽  
Vol 468-471 ◽  
pp. 2859-2862
Author(s):  
Juan He ◽  
Miao Miao Liu ◽  
Qun Zhi Wang

Considering that there lacks study on the empirical identification and analysis of key risk factors of inventory financing, this paper uses SPSS to analyze the reliability and the validity of research data, revising the original index variables and sorting out the main risk factors, and finally establishing an ideal risk evaluation index system. The results of this paper provided a new research framework for risk identification of inventory financing.

2012 ◽  
Vol 45 ◽  
pp. 101-105
Author(s):  
Huang Wenhong ◽  
Hailong Wang ◽  
Xuesheng Li ◽  
Qifu Bao

2020 ◽  
Vol 2020 ◽  
pp. 1-9
Author(s):  
Jiao Wang

Based on the perspective of cost risk management of the entire process of power grid construction project, the WBS-RBS risk identification method is applied. The risk factors of power grid engineering cost are comprehensively identified from the five major engineering cost formation stages: investment decision estimate stage, design estimate stage, bidding price stage, construction budget stage, and final account stage. Combined with the basic data obtained from the questionnaire, the membership degree method is adopted to screen the key indicators of the preliminary factors of cost risk and then eliminate the redundant indicators. Furthermore, a set of simple and efficient risk evaluation index system for power grid engineering cost is constructed in order to improve the risk evaluation and management level of power grid construction project in China.


2013 ◽  
Vol 779-780 ◽  
pp. 1162-1165
Author(s):  
Xun Yu

The System Engineering principles are applied to identify the risk factors of navigation environment of dock waters adjacent to fairway. The Evaluation Index System for risks of navigation environment of such a dock is established and the relative risk degrees among each index are reflected quantitatively by weights of risk factors obtained by adopting the method of AHP. Based on the identified risk factors, the risk control measures for navigation environment of dock waters adjacent to fairway are systematically put forward. One dock in Yangpu Port, Hainan Province, is cited as an example to analyze, and the risk control measures are proposed accordingly.


2012 ◽  
Vol 252 ◽  
pp. 364-367
Author(s):  
Yan Na Zhao

This article puts forward the new research methodology during establishing evaluation index system of industrial manufacturing system competence in He Bei .Firstly, we establish a set of the primary evaluating Index system. Secondly,we assess and screen these Indexes. At lastly ,we determine the final evaluating Index system.The Index system is more objective in this way.


2014 ◽  
Vol 919-921 ◽  
pp. 878-882
Author(s):  
Shi Mei Bai ◽  
Hong Sheng Sun ◽  
Yong Chun Zhao

In this context, firstly, the safety evaluation index system of subway operation is established on the basis of the recognition and analysis of risk factors. Then, the paper constructs the multi-level extensible evaluation model for subway operation safety with the extension method as the core. Finally, Beijing Changping subway is studied as an example. The risk degrees of the line and its subsystems are determined. A new method for comprehensive evaluation of subway operation safety in china is put forward.


2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Baorui Liang ◽  
Suhua Zhang ◽  
Dongping Li ◽  
Yuxin Zhai ◽  
Fei Wang ◽  
...  

Due to the high risk of construction sites, it is necessary to make safety risk evaluation. With the synthetic consideration of the complexity and uncertainty of construction sites, a comprehensive evaluation index system with two levels has been based on the emphases and difficulties of the current safety work in construction industry; the index system includes civilized construction site, management of machinery, equipment, materials, occupation health protection, and the subpackage management, such as 6 one-level evaluation indexes, inspection system of safety risk, safety awareness education, and prevention and control of occupation disease, such as 33 two-level evaluation indexes. The research takes “No. A residential building and other 8 projects” as the empirical analysis object, with the weights of the first indexes and second indexes being calculated by the analytic hierarchy process (AHP) and the information entropy, and applies the unascertained measure to comprehensively evaluate the safety risk of the construction project. The overall score of the project is 6.4475, the evaluation result is good, which is consistent with the actual situation, and the feasibility and effectiveness of the evaluation index system and evaluation model are verified, which provides a reference for safety risk management in the construction stage of construction projects.