Study on Jiping Canal Water Line of South-to-North Water Transfer Project
2014 ◽
Vol 919-921
◽
pp. 1248-1251
Keyword(s):
The South-to-North Water Transfer Project is a cross century water diversion project. So it is very important to ensure its normal operation. The hydraulic calculation of Jiping Canal of the South-to-North Water Transfer Project is carried out in this paper, working out cross section, the profile and the X-Y-Z perspective plot of Jiping Canal respectively. An analysis of the canal stability enables us to get the condition in which the canal is stable, which will provide strong technical support for the design and construction of the canal. Therefore, the analysis has important practical significance. The study will be effective guidance on the normal operation of Jiping Canal of South-to-North Water Transfer Project.
Keyword(s):
2013 ◽
Vol 12
(11)
◽
pp. 2239-2247
◽
Keyword(s):
Keyword(s):
2005 ◽
Vol 32
(1)
◽
pp. 159-163
◽
Keyword(s):
2014 ◽
Vol 1010-1012
◽
pp. 357-360
Keyword(s):
2020 ◽
Vol 30
(1)
◽
pp. 115-126
◽
Keyword(s):
2018 ◽
Vol 14
(6)
◽
pp. 155014771877957
◽