Preliminary Estimates of Building Cost and the Lowest Evaluated Tender
The paper has investigated and established to what extent are preliminary estimates of building costs close to the lowestevaluated tender and how geographical proximity influences the variance between preliminary estimate and the lowestevaluated tender.A multiple case study constituting 43 building projects in Tanzania were statistically analysed covering a period from1995- 1999. Findings reveal a significant variance exists between the quantity surveyor’s preliminary estimate figureand the lowest evaluated tender; and that the variance between the quantity surveyor’s figure and the bidder is smallwhen the proposed building project is geographically closer to the quantity surveyor’s base. Analysis of variance (one -way) has shown geographical distance has a statistical significance on the variance between the preliminary estimatesand the lowest evaluated tender.The study has established that the object of preliminary estimates in building costs, that of making the client aware of hisfinancial obligations at early stages of a building project are not met fully.