time schedule
Recently Published Documents


TOTAL DOCUMENTS

284
(FIVE YEARS 71)

H-INDEX

16
(FIVE YEARS 2)

Author(s):  
I Wayan Suasira ◽  
I Wayan Intara ◽  
I Ketut Sutapa ◽  
I Made Anom Santiana ◽  
I Gede Sastra Wibawa ◽  
...  

The purpose of this study is to determine the dimensions and reinforcement of structure, cost, and schedule due to the transition structure of the building function. The structural transition of building functions is carried out in the earthquake area five with the classification of soft and hard soils. The building used as a research model is a 3-story residence on Nuansa Utama Selatan Street number 3, Jimbaran, Bali. The planning of this building will be converted into office buildings and shophouse on the 2nd and 3rd floors functioning as a warehouse in the earthquake area five in Bali with the classification of soft and hard soil that will be analyzed using SAP 2000 program so that the structural dimensions are used as a reference in the creation of costs, and schedule obtained using Microsoft Project program. The analysis of structure shows that the structure of a residential house on hard soil has the dimensions and reinforcement of the smallest structure. The ratio of structural reinforcement in the transition of structure functions from residential house to office on hard soil by 1.32% with the lowest structure cost ratio by 1.80% and schedule of the structure by 3.80%.


2021 ◽  
Vol specjalny II (XXI) ◽  
pp. 139-149
Author(s):  
Alina Wypych-Żywicka

The rule arising from the Article 154 of the Labour Code applies to a part-time worker. His working time schedule does not justify the annual leave extension. The period of notice begins to run on the day after submitting a notice of termination. In this situation the rule provided in Article 111 of the Civil Code in connection with Article 300 of the Civil Code applies.


2021 ◽  
Vol 3 (4) ◽  
pp. 489-498
Author(s):  
Bona Eirene Mangape ◽  
Josefine E Latupeirissa ◽  
Lintje Tammu Tangdialla

Dunia konstruksi masih banyak ditemukan proyek yang pelaksanaannya tidak sesuai waktu yang ditentukan. Oleh karena itu perlu dilakukan evaluasi penerapan manajemen waktu pada proyek konstruksi gedung Ciputra School of Business yang mengalami keterlambatan pada beberapa sub bagian pekerjaan.  Metode penelitian yang digunakan dalam penelitian ini yaitu metode analisis deskriptif. Dari hasil penelitian dapat diketahui bahwa dalam pelaksanaan proyek kurva-S digunakan sebagai time schedule dalam melakukan monitoring progress dan penjadwalan pekerjaan, kontraktor perlu melakukan pekerjaan secara paralel dengan metode percepatan fast tracking dan memberlakukan lembur agar target mingguan dan bulanan terpenuhi. Dari hasil analisis dapat disimpulkan bahwa pengendalian menggunakan kurva-S dimana baseline dilakukan pertiga bulan selama 1 tahun waktu pelaksanaan menunjukkan besaran deviasi progress pekerjaan pada tahap pertama 1.085%, tahap kedua 1.324%, tahap ketiga -8,971%, dan tahap keempat -5,639%


INFOMANPRO ◽  
2021 ◽  
Vol 10 (2) ◽  
pp. 41-53
Author(s):  
Ardha Rahadian1 ◽  
Lalu Mulyadi ◽  
Lies K. Wulandari

A highway toll project is an urgent need in this modernization era, especially in our country, which currently has a population of around 250 million people. From the population that has been increasing, In the current era the need for transportation is also growing rapidly, Therefore, a safe and comfortable transportation is needed. Relationship with the occurred of soft soil in the STA. 18 + 000 to STA. 20 + 300, the authors need to provide an analyzing way of handling the soft soil in order to meet the criteria for the settlement criteria. Meanwhile, the purpose of making analysis soft soil improvement using minipile is to find out a technical point still meets the requirements stated in the design criteria. To achieve this goal, analysis of the soft soil improvement in carrying out the analysis and calculations was taken from the results analysis of the N-SPT value and laboratory testing material from the soil investigation of the borehole. The calculation results obtained are in the soil improvement methods at the location which was originally using a minipile it can reduce settlement value < 20 mm/years, safety factor in earthquake condition > 1.10 and time schedule for implementation pilling work on site 1 month faster than the time required when using another methods for each location that has of soft soil content, especially in the section STA. 18 + 000 to STA. 20 + 300.


2021 ◽  
pp. 67-78
Author(s):  
Kiran Kumar Shrestha ◽  
Rabindra Kayastha

Background: Risk is associated with every kind of project work whether it is related to engineering construction project, software development project, financial transaction process or business process. There isn't any project which is free of risks. It is inherent in all types of projects. Observing risk associated with a project can help in successful completion of projects in expected time and expected cost with good assurance of quality. This article is concerned with quantitative analysis of risks coined with hydropower construction project in Nepal. Objective: The main objective of this paper is (a) to identify different activities involved in hydropower construction projects (b) to estimate risk associated time schedule of the identified project activities. Materials and Methods: Data required for the fulfillment of the objective are obtained by interview and discussion with executives of “Shiva Shree Hydropower Limited” and by using project schedule charts of projects won by the company. In this article quantitative analysis of schedule risk of hydropower project is studied by simulation method. Results: Different activities involved in hydropower construction project are identified. Also, risk associated with time schedule of project are observed quantitatively by simulation using beta-PERT distribution. Conclusion: Estimation of time schedule associated with project activities is more realistic when it is analyzed by using beta-PERT distribution compared to other statistical distributions.


2021 ◽  
Author(s):  
Edgar Salgado ◽  
Oscar A. Mitnik

Driving restrictions are popular interventions in rapidly urbanizing developing countries. Their relatively inexpensive implementation appeals to the pressing need to reduce traffic congestion and pollution. Their effectiveness however, remains contested. Using high frequency data from the community-based driving directions app Waze, we evaluate the causal effect on traffic congestion of Lima's Pico y Placa driving restriction policy introduced in 2019. We find small improvements in traffic congestion for the policy's directly targeted areas. However, those improvements are offset by time and spatial spillovers in the opposite direction in the aggregate. Speed improved by 2 percent during the early weeks of the intervention, but this effect disappeared 16 weeks after the start of the policy. Moreover, traffic conditions worsened in adjacent areas and in hours outside the time schedule of the policy. In the aggregate, accounting for time and spatial spillovers, a simulation exercise suggests that overall welfare declined by 2 percent, mostly driven by the extensive margin (more roads becoming congested) outside the direct areas and hours targeted by the policy. The policy seems not only to have failed to achieve its intended benefits in terms of congestion, but also probably caused increases in traffic-related pollution. These results highlight the need for policy makers to take into account the overall impacts of driving restrictions policies before implementing them.


2021 ◽  
Vol 2021 (4) ◽  
pp. 528-536
Author(s):  
Anton G. FILIPPOV ◽  
◽  
Sergey S. SMIRNOV ◽  
Denis V. YAZEV ◽  
Igor P. ALEXANDROV ◽  
...  

Objective: Automation of processing data on passenger traffi c in an arbitrary direction in order to determine the number of “threadsˮ in the time schedule for suburban passenger traffi c in the future. Verifi cation of the adequacy of the existing infrastructure and design solutions for reconstruction in terms of ensuring the required throughput capacity of railway lines. Methods: The calculation of the number of trains is carried out by mathematical modeling of passenger traffi c distribution by hours of the day on each day of the week of the initial month. The identifi cation of trains with non-daily destination is made by comparing the calculation results for each day of the week. Results: An algorithm has been developed for calculating on a computer the perspective amount of suburban train traffi c, taking into account the uneven distribution of passenger traffi c by hours of the day and days of the week. Practical importance: The data obtained using the presented algorithm makes it possible to simplify the development of advance time schedules, taking into account the needs of the population in transportation. The results of the work can be used in feasibility studies for the reconstruction of station layout development and passenger devices, as well as serve as the basis for the technical re-equipment of lines in order to increase their throughput (replacement of signaling and communication equipment, construction of second main tracks, reconstruction of yard necks, etc.). The results of the calculation also make it possible to identify schedule “threadsˮ for withdrawal of trains on days of the week when they are not in demand, but at the same time take into account non-daily trains when developing a standard time schedule. The form of presentation of the results takes into account the spatial irregularity of passenger traffi c and makes it possible to distinguish zonal trains.


CERUCUK ◽  
2021 ◽  
Vol 5 (2) ◽  
pp. 151
Author(s):  
Ahmad Anshori ◽  
Candra Yuliana

The effect of planning on construction projects will have an impact on income within the project itself. Usually, the realization of work plans in the field often experiences delays in the process, because the number of revenue was determined by the method of payment stipulated in the construction contract. Payment system aspects affect the working capital that needs to be provided by the contractor. Therefore, the role of planning the flow of cash flow is very substantial in the implementation of the project. The purpose of this study is to get a cash flow plan with a Monthly Payment system and Progress Payment system based on the project schedule of the Road Works-Road Widening On Kurnia Street North Landasan Ulin Banjarbaru. The method used to analyze the data is project scheduling by making the description and sequence each activity, determining the duration for each project work, and making a project network diagram using the PDM Method ( Precedence Diagram Method ). Then make a cash flow analysis with monthly payment system and progress payment with three payments, at cumulative progress 30.04%, 70.28%, and 100% on the conditions of EST ( Earliest Start Time ) and LST ( Latest Start Time ) schedule. The results of the data analysis show that the payment system that provides maximum benefits is the Monthly Payment system using a 20% down payment on the EST ( Earliest Start Time ) and LST ( Latest Start Time ) schedule conditions with a total loan of Rp. 653,000,000, the contractor gets a profit of Rp. 490,990,222 with a percentage of profits of 8,892%. 


2021 ◽  
Vol 12 (2) ◽  
pp. 58-68
Author(s):  
Fachrul

Abstract Bell is certainly no stranger to education. In general, the bell still uses human power to ring it. It is still rare in the world of education to use an automatic bell that can work alone according to a predetermined time in the teaching and learning process. The purpose of the design of automatic bells at STIKOM Tunas Bangsa Pematangsiantar is to facilitate the work of picket officers and optimize the time for teaching and learning. The work process of this tool is to input the predetermined lesson time into the Arduino Uno Microcontroller using C language in the Arduino IDE Software. After that the microcontroller will read the program schedule hours that have been inputted into the microcontroller. If the program inputted matches the time schedule of today's lesson hours, the bell will automatically output the output in the form of an information notification sound. This tool also has a 16x2 Keypad Shield for setting the manual in the test mode that is matched in the time of the ongoing test and automatically produces notification sound output, where the automatic bell is fully controlled with the Arduino Uno Microcontroller command and the time setting that has been set into the RTC ( Real Time Clock) as a time saver.   Keywords: Arduino Uno, RTC, Keypad Shield 16x2, STIKOM Tunas Bangsa


Sign in / Sign up

Export Citation Format

Share Document