Information Modeling of Wind Flows for Object of Parametrical Architecture

2021 ◽  
pp. 321-328
Author(s):  
Galina Kravchenko ◽  
Elena Trufanova ◽  
Lyubov Pudanova

Improving the efficiency of life cycle management of capital construction projects using information modeling technologies is one of the important tasks of the construction industry. The paper presents an analysis of accumulated domestic practices, including the legal and regulatory framework, assessing the effectiveness of managing the implementation of investment construction projects and of complex and serial capital construction projects, as well as the life cycle management of especially dangerous technically complex and unique capital construction projects using information modeling technologies, especially capital construction projects, as well as their supporting and using systems, primarily in the nuclear and transport sectors. A review of modern approaches to assessing the effectiveness of life cycle management systems of complex engineering systems in relation to capital construction projects is carried out. The presented material will make it possible to formulate the basic principles and prospects of applying approaches to assessing the effectiveness of the life cycle management system of a capital construction project using information modeling technologies.


The paper describes the main trends in the development of BIM technologies in the field of restoration and reconstruction of historical and cultural heritage buildings. The practical part of the paper presents the experience in using information modeling technologies when restoring the building, where the VI Congress of the Chinese Communist Party in Moscow took place. The use of laser scanning technologies made it possible to reproduce with high accuracy in the information model the original appearance of the building using Autodesk RevitR software. It is shown, how the use of information modeling technologies affects the duration of restoration process, taking into account the calculation of the structural scheme and bearing structures of the building, ensuring the identity of the decoration and the effective organization of electromechanical installation. Operating in a single BIM information environment makes it possible to continuously obtain reliable information on the project, which provides more effective information interaction and communication of participants compared to using traditional design methods.


The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


The variants of the division of the life cycle of a construction object at the stages adopted in the territory of the Russian Federation, as well as in other countries are considered. Particular attention is paid to the exemplary work plan – "RIBA plan of work", used in England. A feature of this document is its applicability in the information modeling of construction projects (Building information Modeling – BIM). The article presents a structural and logical scheme of the life cycle of a building object and a list of works that are performed using information modeling technology at various stages of the life cycle of the building. The place of information models in the process of determining the service life of the building is shown. On the basis of the considered sources of information, promising directions for the development of the life cycle management system of the construction object (Life Cycle Management) and the development of the regulatory framework in order to improve the use of information modeling in construction are given.


Author(s):  
Seunghwa Park ◽  
Inhan Kim

Today’s buildings are getting larger and more complex. As a result, the traditional method of manually checking the design of a building is no longer efficient since such a process is time-consuming and laborious. It is becoming increasingly important to establish and automate processes for checking the quality of buildings. By automatically checking whether buildings satisfy requirements, Building Information Modeling (BIM) allows for rapid decision-making and evaluation. In this context, the work presented here focuses on resolving building safety issues via a proposed BIM-based quality checking process. Through the use case studies, the efficiency and usability of the devised strategy is evaluated. This research can be beneficial in promoting the efficient use of BIM-based communication and collaboration among the project party concerned for improving safety management. In addition, the work presented here has the potential to expand research efforts in BIM-based quality checking processes.