A hyper-heuristic approach for stochastic parallel assembly line balancing problems with equipment costs
Keyword(s):
2013 ◽
Vol 46
(9)
◽
pp. 845-850
◽
Keyword(s):
2011 ◽
Vol 11
(3)
◽
pp. 3186-3198
◽
2017 ◽
Vol 26
(1)
◽
pp. 90
◽
Keyword(s):
2008 ◽
Vol 20
(1)
◽
pp. 123-136
◽
Keyword(s):
2008 ◽
Vol 2
(1)
◽
pp. 50
◽
2012 ◽
Vol 23
(6)
◽
pp. 283-295
◽
Keyword(s):
2017 ◽
Vol 26
(1)
◽
pp. 90
Keyword(s):