A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines
2007 ◽
Vol 182
(2)
◽
pp. 945-951
◽
Keyword(s):
2017 ◽
Vol 10
(5)
◽
pp. 887
◽
2014 ◽
Vol 71
(5-8)
◽
pp. 1229-1245
◽
2010 ◽
Vol 37
(5)
◽
pp. 960-969
◽
Keyword(s):
2013 ◽
Vol 28
(3)
◽
pp. 358-368
◽
Keyword(s):
Keyword(s):
2019 ◽
Vol 52
(3)
◽
pp. 484-506
◽
Keyword(s):
2013 ◽
Vol 51
(12)
◽
pp. 3625-3642
◽
Keyword(s):
2015 ◽
Vol 54
(4)
◽
pp. 963-983
◽