scholarly journals On the usage of Least Material Requirement for Functional Tolerancing

Procedia CIRP ◽  
2018 ◽  
Vol 75 ◽  
pp. 179-184 ◽  
Author(s):  
Laurent Pierre ◽  
Bernard Anselmetti ◽  
Nabil Anwer
2015 ◽  
Vol 3 (2) ◽  
Author(s):  
Vipul Chalotra

The present research divulges the different inventory control techniques used small scale cements enterprises operated by small scale entrepreneurs through the assistance of primary data collected from eight small scale cement enterprises operating in SIDCO & SICOP, under DIC (District Industries Center) in District Udhampur of Jammu & Kashmir State. The various inventory control techniques identified and quested for in the research were: Always Better Control (ABC), Economic Order Quantity (EOQ), Material Requirement Planning (MRP), and Just-in-Time (JIT). The results of the ranking table quoted that Economic Order Quantity (EOQ) was awarded first rank by almost all the units representing overall mean score of 1.71, Always Better Control (ABC) was denoted by rank two repressing overall mean value as 2.00, Material Requirement Planning (MRP) was quoted rank three as depicted by its mean ranking (2.25), and Just-in-time (JIT) was accorded rank four (3.71) by almost all the small scale cements entrepreneurs/owners.


Resources ◽  
2013 ◽  
Vol 2 (3) ◽  
pp. 270-285 ◽  
Author(s):  
Heming Wang ◽  
Qiang Yue ◽  
Zhongwu Lu ◽  
Helmut Schuetz ◽  
Stefan Bringezu

2020 ◽  
Vol 5 (1) ◽  
pp. 1-12
Author(s):  
Rudi Abdika Saputra ◽  
Inna Kholidasari ◽  
Susanti Sundari ◽  
Lestari Setiawati

This study discusses the application of the material requirements planning (MRP) method in the planning of raw materials in a furniture company. The purpose of this research is to know the planning of raw materials for furniture products in UD. AA, determine the most suitable inventory model to be applied to material inventory planning and analyze the role of the MRP system in raw material procurement planning. The forecasting method used is the quantitative method of time series analysis, determining the master production schedule, calculating lot sizing (LFL, EOQ, POQ methods). From determining the Master Production Schedule, it is found that the cabinet production plan for the next three months is 4 units per period or week, and based on the calculation of Material Requirement Planning (MRP) it can be seen what components are needed for the manufacture of cabinets, how many and when each component is required. Therefore it is obtained that the total raw material requirement for wood for the next three months is 11.34 m³.


Sign in / Sign up

Export Citation Format

Share Document