A Hierarchical Production Planning Approach for a Steel Manufacturing System

1992 ◽  
Vol 12 (5) ◽  
pp. 69-78 ◽  
Author(s):  
R.P. Mohanty ◽  
R. Singh
Author(s):  
Reza Tanha Aminlouei

In real power systems, power plants are not in the equal space from the load center, and their fuel cost is different. With common utilization conditions, production capacity is more than total load demand and losses. Therefore, there are different criteria for active and inactive power planning in each power plant. The best selection is to choose a framework in which the utility cost is minimized. On the other hand, planning in power systems has different time horizons; thus, for effective planning in power systems, it is very important to find a suitable mathematical relationship between them. In this chapter, the authors propose a modeling by selecting a Fuzzy Hierarchical Production Planning (FHPP) technique with zone covering in the mid-term and long-term time horizons electricity supply modeling in the Iran global compact network.


Sign in / Sign up

Export Citation Format

Share Document