Utilization of Water Energy Potential on Tail Race for Very Low Head Hydro Power Plant

Author(s):  
Ridwan Arief Subekti ◽  
Anjar Susatyo ◽  
Henny Sudibyo ◽  
Ghalya Pikra
2018 ◽  
Vol 153 ◽  
pp. 74-79 ◽  
Author(s):  
Romy Marliansyah ◽  
Dwini Normayulisa Putri ◽  
Andy Khootama ◽  
Heri Hermansyah

2014 ◽  
Vol 698 ◽  
pp. 785-789
Author(s):  
Yana Panova ◽  
Vladimir Derbenev ◽  
Anastasiya Zhdanovich

This article is devoted to the principles of constructing the decision support information system at the hydroelectric power plants. It’s assumed that the fuzzy sets theory will be used for the representation of the information about the aggregates operating condition parameters. The paper reflects the advantages of such an approach. The calculations were done for the equipment of the low-head (Novosibirskaya HPP, Hydro Power Plant) and high-head (Sayano–Shushenskaya HPP) power plants. The results obtained are intended for solving the HPPs operational control problems.


2021 ◽  
Vol 5 (2) ◽  
pp. 201
Author(s):  
Muhammad Ikhsan ◽  
Nuzuli Fitriadi

This paper provides survey results of an electricity system that has been carried out from isolated village of Alue Keujrun, South Aceh, Indonesia. The village has a central photovoltaic power plant and a micro hydro power plant. Various problems in the field such as operation errors, lack of maintenance of the electric power system, low voltage and frequency have been found. Power plant operators have also never received any formal training from any institution. The village is located next to the Kluet river which has a very large potential to become a hydrokinetic power plant energy source. Therefore the Kluet river flow velocity was also measured during the survey and described within this paper. Based on the interviews results with local operators, the village power plant does not have an operating permit. Thus, we consider that it is important to review the types of permits required to establish a power plant in Indonesia, including small-scale power plants.


Author(s):  
Liudmila Fedorovna Borisova ◽  
Aleksandr Nikolaevich Korobko

The article contains the method of calculating the electric capacity by a non-self-propelled hydro power vessel which uses renewable tidal power to produce electricity. The vessel is built by means of reconstructing tankers that are in service or to be disposed and can be characterized as a power generating module of a floating non-self-propelled tidal power plant of continuous operation. To evaluate efficiency of the power generated module there has been worked out a method of calculating its generated energy, which allows for local energy potential of the tidal flow, structural characteristics of the module and its geographical position. Based on the developed method there has been given analysis of power generated by one electric power module which can be made by means of construction minor modifications of a standard tanker design. The calculation data obtained were analyzed in comparison with power capacity of small hydroelectric power plants operating in the north-west parts of Russia and with capacity of Kislogubskaya tidal power plant. The tidal power plants can generate electric power comparable with the capacities of tidal (marine) and river-type power plants. The economic benefit of the proposed power plant design is obtained due to significant reduction of costs for implementing floating tidal power plant, compared to the costs of the construction of tidal and hydroelectric stations. The floating tidal power plant is characterized by mobility and can be towed to any coastal zone where the tidal wave parameters are acceptable. When needed, capacity of the floating tidal power plant can be raised by means of attaching additional modules. Mounting and operating of tidal power plants are environmentally secure. The use of tidal power plants is a promising means of electrification for inaccessible and marginal coastal areas.


2020 ◽  
Vol 140 (6) ◽  
pp. 531-538
Author(s):  
Kotaro Nagaushi ◽  
Atsushi Umemura ◽  
Rion Takahashi ◽  
Junji Tamura ◽  
Atsushi Sakahara ◽  
...  

AMBIO ◽  
2021 ◽  
Author(s):  
Gunta Spriņġe ◽  
Māris Bērtiņš ◽  
Lesya Gnatyshyna ◽  
Ilga Kokorīte ◽  
Agnese Lasmane ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document