Transport of Radioactive Waste in the Nuclear Power Plant at Dukovany

1994 ◽  
Vol 5 (1) ◽  
pp. 43-45
Author(s):  
J. Kulovany
2021 ◽  
Vol 24 (3) ◽  
pp. 291-301
Author(s):  
Akhmad Tri Prasetyo ◽  
Muslim Muslim ◽  
Heny Suseno

The study of radioactive dispersion in the ocean should be conducted to prepare the construction of nuclear power plant (NPP) in Gosong Coast, West Kalimantan. This study estimated the distribution of 137Cs radioactive from various scenarios of radioactive waste dumping if nuclear emergency is occurred during NPP’s operation. These scenarios were distinguished based on their volume discharges of radioactive waste into the ocean, included 10 m3 (Scenario I), 50 m3 (Scenario II), and 100 m3 (Scenario III).  Model dispersions were constructed for 15 days by Delft3D-Flow module. The simulation showed that ocean current directions were not significantly different among spring and neap tide, instead the ocean current during the spring period dominantly increased rather than neap period. Ocean currents at Gosong Coast flowed parallel to the shoreline towards Singkawang Coastal Area during ebb tide. Meanwhile, during flood tide, ocean currents at Gosong Coast flowed offshore through Burung Archipelagic. The dispersed model showed the distribution of 137Cs radioactive for 15 days reaching to coastal areas of Burung Archipelagic, Singkawang, and Southern Sambas Coast. Each scenario of the disposal system did not influence the marine pollution of the West Kalimantan Sea.


Author(s):  
Borys Ya. Oskolkov ◽  
Yuri A. Neretin ◽  
Valeryi P. Saliy ◽  
Valeryi A. Seyda ◽  
Vyascheslav V. Fomin

According to the assessments the overall amount of radioactive waste (RAW) to be reprocessed and buried at the Chornobyl NPP site amounts to 1,696,738 m3 (without regard for reactor metal structures, dismantling of building structures and plan constructions, and the Unit Shelter building). The overall activity of radioactive waste are evaluated at 1,640,504.64 ΤBq. The RAW management activities are implemented at the Chornoby1 NPP within the frame of several programs of different hierarchy including the State Comprehensive Program for RAW Management in Ukraine, Integrated Program of RAW Management at the Chornoby1 NPP Shutdown Stage and Transformation of the Unit Shelter into an Ecologically Safe System. At the present time a number of key RAW management facilities are being constructed within the frame of the international aid to Ukraine. They are the Liquid Radioactive Waste Plant and Solid Radioactive Waste Reprocessing Complex. As of now, the issues concerning RAW utilization at the Unit Shelter are resolved at a conceptual level. There has not practical decision in relation to a geologic facility. The complexity and scale of ChNPP RAW management problems will require significant efforts of both Ukraine and the whole world community to solve these issues. The task related to removal and final burial of accumulated and generating radioactive waste is one of the main aspects of decommissioning activities at any nuclear power plant. RAW management work is the most important and complicated work performed at the Chornoby1 NPP. The specific features of ChNPP RAW management are as follows: • Variety of RAW generation sources, their types, physical and chemical properties. • Large amount of radioactive wastes which already exist and those generated in the decommissioning process. • Presence of disorganized RAW characterized by wide spatial distribution within the Unit Shelter and at the plant site. • Need to apply a very wide spectrum of various RAW management techniques depending on their location and type. • Need in developing unique techniques to manage special types of RAW located at the site (fuel containing masses of the Unit Shelter). • Large amount and variety of facilities required for RAW final storage. • Absence of reliable and serviceable instrumental procedures and necessary equipment to define RAW properties for RAW separation and classification. • Ecological peculiarities of RAW management within the Chornoby1 zone. • Multiphase decontamination and restoration processes resulting in RAW formation. • Need in integrating RAW management problems at the ChNPP and within the Chornoby1 Exclusion Zone taken as whole. • Long time period required for implementing the whole program of RAW management at the ChNPP. • Large quantity of people involved in RAW management process (local and foreign participants, different organization operated by various departments).


Author(s):  
Carmen Arsene ◽  
Dumitru Negoiu

For the conditioning of spent resins contaminated with radionuclides, such as: 137Cs, 134Cs, 60Co, 58Co, 57Co, 54Mn, etc., techniques of direct immobilization in cement, bitumen and organic polymers have been tested. The selected process was the bituminization using industrial bitumen, I 60–70, made in Romania, which had very good immobilizing characteristics. The paper presents stages of the research project, technical conditions for the process and advantages of the bituminization of spent resins.


Author(s):  
Juan L. Santiago ◽  
Sergio Vidaechea

Abstract Spain occupies a leading position at international level in the field of installation decommissioning. Decommissioning projects have already been performed in relation to uranium mills, the rehabilitation of disused uranium mines is currently in the final phase and the dismantling of the Vandellós-I Nuclear Power Plant is now under way. On the basis of this experience, this paper describes the key issues in decommissioning technology and presents the approaches adopted by ENRESA to tackle the decommissioning strategy in Spain. In particular practical dismantling and decontamination methods are described, and material and radioactive waste management are discussed.


Author(s):  
Tero Lytsy ◽  
Mia Ylä-Mella

Fennovoima is Finland’s third nuclear power company founded in 2007. Fennovoima will build a new nuclear power plant, Hanhikivi 1, in Pyhäjoki municipality located in Northern Finland. Currently Fennovoima is evaluating bids from reactor suppliers. Originally two suppliers, AREVA and Toshiba Heavy Industries were invited to bid for the plant but later also a bid from Rosatom were invited. The plant supplier will be selected in 2013. Platom is a Finnish company with extensive experience in radioactive waste management. In the beginning of 2008, Platom was assigned by Fennovoima as radioactive waste management consultant and to develop radioactive waste management strategy and to support Fennovoima in negotiations with plant suppliers in waste management aspects. Since Fennovoima has started, there have been some changes to the regulatory requirements which had to be taken into account while developing the strategy. One important change is due to the Government Degree 27.11.2008/736 which establishes a new waste category of very low-level waste following international development and the “new” IAEA waste classification. Other important change was introduced by the change 342/2008 to the Nuclear Energy Act allowing some nuclear waste to be delivered to another country for treatment. These and many more requirements had to be considered when developing the strategy. Early work by Platom was mostly done to support development of application for Decision-in-Principle. This was the first important licensing step for Fennovoima. Work started with studies and plans which were used by Fennovoima to gather the know-how required to draw up the application. Descriptions of waste streams and waste management technologies were developed as well as preliminary waste inventories and studies for final disposal, including preliminary dimensioning of the repository facilities. Based on these plans nuclear regulator’s preliminary safety assessment was performed. The work was successfully completed as in 2010 the Government of Finland granted Fennovoima a permit to build a new nuclear power plant. The work continued in 2012 when bids were received for EPR and ABWR type reactors. Plans developed earlier were elaborated into a detailed strategy and the proposed waste management solutions were evaluated. This allowed feedback from the bids into the strategy and to the bid specification and they both were developed. Also waste inventories were elaborated which allowed development of reactor design specific disposal strategies. The main objective of work has been to establish basis for safe and efficient radioactive waste management which meets all the relevant national and international recommendations, requirements and regulations, takes advantage of best available and state-of-art technologies and offers fit-for-purpose solutions. All the work was performed to accommodate requirement based management system.