Development of water infrastructure benefits water security and agriculture but poses risks to habitat and aquatic fauna. Wyaralong Dam was constructed on Teviot Brook in 2010 to provide future urban water supplies for South East Queensland, Australia. Construction of the dam created a large impoundment area and environmental impact assessment predicted significant impacts upon resident freshwater turtle species and their habitats. Differences in habitat requirements, life-history characteristics and sensitivity to change between the Macquarie River turtle (Emydura macquarii macquarii) and the common saw-shelled turtle (Myuchelys latisternum) were expected to influence the impact of the dam on the spatial and temporal abundance of these species. The relative abundance of each species was monitored at sites located within, upstream and downstream of the impoundment across wet and dry seasons during the dam’s first five years of operation. The results of this monitoring program indicate that spatial and temporal variability in the relative abundance of E. macquarii macquarii and M. latisternum occurred during the study but not all expected impacts were realised. Contrary to expectation, the relative abundance of E. macquarii macquarii did not increase over time within, upstream or downstream of the dam. M. latisternum showed greater temporal variability at some sites; however, no clear relationship between relative abundance and operational years was observed during the monitoring program. Spatial variability in relative abundance between sites was dependent upon season, with trends generally consistent across both turtle species. Where differences between species were observed, these are suspected to have resulted from the influence of environmental conditions on species-specific movement behaviours. The monitoring program confirmed the use of the upper limits of the impoundment and the plunge pool below the dam wall by both turtle species but relative abundance within the main body of the impoundment remained low throughout monitoring. The results of the study allow for consideration of the suitability of predefined management measures and the development of recommendations for future monitoring programs prescribed for water infrastructure developments.


Author(s):  
Enrique Dussel Peters

The socioeconomic and political relationship between Latin America and the Caribbean (LAC) with China has become increasingly significant for both since the beginning of the 21st century. This article analyzes proposals by the United States and China in their bilateral relationship and the political effects of their increasing tensions on LAC. Consistent with the proposed framework of analysis of the socioeconomic LAC–China relationship—at least in terms of trade, financing, overseas foreign direct investments, and infrastructure projects—the article examines in detail these conditions, as well as providing an in-depth example of trade. The final part of the article discusses the important potential and challenges of China for LAC’s development and concludes that so far, and based on the in-depth analysis of the trade relationship, the LAC–China relation is closer to a core-periphery than to a South–South or win–win strategy. The document proposes to understand that the political economy within the United States, particularly of its private sector, have shifted substantially against China. In addition, the structure for analysis of the LAC-China relationship in the 21st century with a concrete structure of analysis in terns of trade, financing, Chinese overseas foreign direct investments (OFDI) and infrastructure projects. In light of current discussions, the analysis suggests for the inclusion of a group of new concepts –such as the “the new triangular relationships” and the “globalization process with Chinese characteristics” with a group of effects in LAC. The impact of the increasing China-United States tensions, from this perspective, generates massive challenges in LAC, independently of their diplomatic relationships to China.


2019 ◽  
Vol 24 (3) ◽  
pp. 338-357 ◽  
Author(s):  
Khotso Dithebe ◽  
Clinton Ohis Aigbavboa ◽  
Wellington Didibhuku Thwala ◽  
Ayodeji Emmanuel Oke

Purpose The role of public–private partnerships (PPP) as a strategic initiative to improve and accelerate service delivery in the form of newly built and revitalised water infrastructure assets in developing countries cannot be over-emphasised. Hence, the purpose of this study is to assess and highlight the importance of critical success factors for water infrastructure projects delivered under public–private partnerships. Design/methodology/approach A survey design was used and a questionnaire was administered to stakeholders who have participated in delivering water infrastructure assets in South Africa. Out of 150 administered questionnaires, only 91 were returned and usable for analyses, representing a 61 per cent response rate. The data gathered were then analysed using descriptive and factor analysis. Findings The study revealed that thorough planning for project viability, high levels of transparency and accountability and a legal framework stipulating policy continuity are the CSFs for delivering water infrastructure projects under the PPP initiative. The findings emerging from factor analysis owing to a close variance revealed the importance of the following grouped factors, namely, public cooperation, project viability and policy and legislation enhancement. Practical implications From the results, it is clear that the public sector, as the facilitator of infrastructure development, should create an environment that is conducive for private capital through political will and commitment and the enhancement of policy and legislation where there is no or minimal private participation. Originality/value Adequate infrastructure investment from private capital promises to flourish economically and improve the living conditions of the public in the cities and the country at large. To further guarantee the reality of PPPs at a local level, the host government must adequately engage and enlighten the public.


2005 ◽  
Vol 97 (4) ◽  
pp. 30-32
Author(s):  
Stephanie White ◽  
Gearge Oamek ◽  
Jennifer Martinek

2016 ◽  
Vol 7 (1) ◽  
pp. 28-40 ◽  
Author(s):  
Dimitrios Paraskevadakis ◽  
Alan Bury ◽  
Jin Wang ◽  
Jun Ren ◽  
Stephen Bonsall ◽  
...  

Abstract In the North West of England the issue of a perceived infrastructure gap is of increasing concern. Investment needs to be made to improve the transport infrastructure of the region if it is to be expected to promote the development of its own regional logistics gateway. Funding tools have been set up to address the challenges arising from the imbalance in infrastructure development that exists between regions in the north of the United Kingdom and those in the south. For regions with well developed economies the outlook is promising as the availability of modern transport infrastructure looks set to improve. However, some sources believe that the development of new transport infrastructure will have a negative impact upon sustainable development. It is expected that this will occur in a range of both direct and indirect ways. As a result, it is critical that planning for the creation of new intermodal transport infrastructure, or the upgrading of that which already exists, takes into account the impact that these developments will have on the sustainable development of the host region. A scenario based development methodology is proposed in this paper. It was developed to provide a way to identify potential scenarios that may arise within a given region as a result of transport infrastructure projects. To create significant scenarios the methodology is dependent on the availability of a sufficient quantity of quality data. For this paper that data was collected through a focus group composed of stakeholders from the region in question. This was further supported by the performance of an impact survey using the same group of stakeholders.


Author(s):  
L. S. Plekhanova ◽  
A E. Shpilevaya

 The paper analyzes structural alternatives in the implementation of infrastructure projects on the example of main gas pipelines. Particular attention is paid to the impact of various forms of procurement procedures on the course and result of the implementation of the infrastructure project as a whole. It is shown that the choice of procurement method can influence the structure of incentives and risks of the parties involved, as well as indirectly impact on the establishment of the market price setting, the level of product quality in the industry, and the complex cost of project implementation. Noting the extreme importance of the issues of ensuring the quality of the products used, the authors review the available structural alternatives for organizing quality control, show the possible mechanisms of the influence of the downtime of enterprises on reducing the level of industry competencies.