Abstract A network modeling campaign for 15 surface gathering centers involving more than 1800 completion strings has helped to lay out different risks on the existing surface pipeline network facility and improved the screening of different business and action plans for the South East Kuwait (SEK) asset of Kuwait Oil Company. Well and network hydraulic models were created and calibrated to support engineers from field development, planning, and operations teams in evaluating the hydraulics of the production system for the identification of flow assurance problems and system optimization opportunities. Steady-state hydraulic models allowed the analysis of the integrated wells and surface network under multiple operational scenarios, providing an important input to improve the planning and decision-making process. The focus of this study was not only in obtaining an accurate representation of the physical dimension of well and surface network elements, but also in creating a tool that includes standard analytical workflows able to evaluate wells and surface network behavior, thus useful to provide insightful predictive capability and answering the business needs on maintaining oil production and controlling unwanted fluids such as water and gas. For this reason, the model needs to be flexible enough in covering different network operating conditions. With the hydraulic models, the evaluation and diagnosis of the asset for operational problems at well and network level will be faster and more effective, providing reliable solutions in the short- and long-terms. The hydraulic models enable engineers to investigate multiple scenarios to identify constraints and improve the operations performance and the planning process in SEK, with a focus on optimal operational parameters to establish effective wells drawdown, evaluation of artificial lifting requirements, optimal well segregation on gathering centers headers, identification of flow assurance problems and supporting production forecasts to ensure effective production management.


2003 ◽  
Vol 43 (1) ◽  
pp. 401
Author(s):  
R. Seggie ◽  
F. Jamal ◽  
A. Jones ◽  
M. Lennane ◽  
G. McFadzean ◽  
...  

The Legendre North and South Oil Fields (together referred to as the field) have been producing since May 2001 from high rate horizontal wells and had produced 18 MMBBL by end 2002. This represents about 45% of the proven and probable reserves for the field.Many pre-drill uncertainties remain. The exploration and development wells are located primarily along the crest of the structure, leaving significant gross rock volume uncertainty on the flanks of the field. Qualitative use of amplitudes provides some insight into the Legendre North Field but not the Legendre South Field where the imaging is poor. The development wells were drilled horizontally and did not intersect any fluid contacts.Early field life has brought some surprises, despite a rigorous assessment of uncertainty during the field development planning process. Higher than expected gas-oil ratios suggested a saturated oil with small primary gas caps, rather than the predicted under-saturated oil. Due to the larger than expected gas volumes, the gas reinjection system proved to have inadequate redundancy resulting in constrained production from the field. The pre-drill geological model has required significant changes to reflect the drilling and production results to date. The intra-field shales needed to be areally much smaller than predicted to explain well intersections and production performance. This is consistent with outcrop analogues.Surprises are common when an oil field is first developed and often continue to arise during secondary development phases. Learnings, in the context of subsurface uncertainty, from other oil fields in the greater North West Shelf are compared briefly to highlight the importance of managing uncertainty during field development planning. It is important to have design flexibility to enable facility adjustments to be made easily, early in field life.


2020 ◽  
Author(s):  
Amir Salehi ◽  
Gill Hetz ◽  
Soheil Esmaeilzadeh ◽  
Feyisayo Olalotiti ◽  
David Castineira

2020 ◽  
Vol 10 (3) ◽  
pp. 102-122
Author(s):  
Dr. Jalal A. Al-Sudani ◽  
Eng. Adnan N. Sajet ◽  
Eng. Jalal Ahmed ◽  
Eng. Mohamed Enad ◽  
Dr. Abdul-Hussain H. Al-Shibly ◽  
...  

Akkas gas field is the biggest natural gas field in Iraq that is located in the western desert area. The field contains around (9 BSCF) of approved gas reserve from the conventional rock source. This paper presents field development planning process combined with economic analysis comprises, the number of wells that yields in maximum net present value (NPV), the recovery factor and raw gas production rates for the total number of suggested wells that have been estimated, as well as the cumulative gas produced with time. The development plans were elaborated concerning different types of well geometries and operational constraints. Full comparison analysis for all presented plans regarding NPV, recovery factor, discounted cash flow versus production time, forecasted production rate, as well as forecasted cumulative production with time have been presented. Sensitivity analysis has been made to determine well and reservoir controlling parameters that leads for best operating field development plans. The study shows the effectiveness of horizontal well type compared with vertical wells; as well as, the effect of reservoir permeability on field development plans, the results show that the field could be operated at target plateau rates of (250, 500 and 750 MMSCF/D). It also shows the superior effect of stimulation processes in increasing the NPV and field recovery factor using less number of wells


2021 ◽  
Author(s):  
Mohand Ahmed Alyan ◽  
Jamie Scott Duguid ◽  
Atif Shahzad ◽  
Amna Ahmed Alobeidli ◽  
Alunood Khalifa Al Suwaidi ◽  
...  

Abstract This paper describes the field development planning strategy for appraising and developing an offshore reservoir area via extended reach extra-long maximum reservoir contact laterals drilled from an artificial island. These single production and injection laterals are completed in excess of 20,000 ft on top of tens of thousands feet of drilled well path to reach the drain landing point. These laterals have a dual purpose, as in addition to reservoir appraisal, is to maximize the productivity and injectivity in an on-going development of a tight carbonate reservoir. The well planning process starts from a careful selection of reservoir target coordinates to maximize the oil in place being developed from the artificial island and to enable reservoir testing and appraisal. From this data, initial 3D well designs are generated based on island location and rig capability to ensure ability to drill and run completion to total depth. The generated well tracks are used in a reservoir model to forecast production uplifts and inflow/outflow profiling along laterals. A strategic drilling step-out program has been implemented to extend drilling reach and completion deployment incrementally along with a reservoir surveillance program. The program was designed with built-in risk mitigations for any potential drilling and completion issues. The implemented program has enabled drilling into new areas and testing the reservoir properties at a small incremental cost of extending horizontal laterals. This has led to huge cost savings versus a very expensive appraisal program from a wellhead platform that included drilling a new well in addition to topside facility changes and pipelines conversions along with associated maintenance costs. The data gathered from these wells have enabled reduction of geologic uncertainty and de-risking of future developments. As a result, the field development footprint of developed oil resources was extended by additional 20% without the requirement of building additional drilling structures. Additionally, there is a well count reduction via lateral extension thus leading to capital costs saving. There were initial challenges encountered during lower completion deployment but they were resolved successfully in subsequent wells. An outcome of this strategy was the successful drilling of maximum reservoir contact wells with tens of thousands feet of drilled well path to reach the drain landing point and then with single horizontal drains exceeding 20,000 ft. The drilled wells resulted in unprecedented records in UAE and globally in terms of well total length, horizontal drain length and completion deployment.


PEDIATRICS ◽  
2016 ◽  
Vol 137 (Supplement 3) ◽  
pp. 256A-256A
Author(s):  
Catherine Ross ◽  
Iliana Harrysson ◽  
Lynda Knight ◽  
Veena Goel ◽  
Sarah Poole ◽  
...  

2019 ◽  
Vol 2 (1) ◽  
Author(s):  
Izzuddin Latif ◽  
Widayati Widayati

Facilitation of Development Planning is very urgent and vital as an instrument to increase effectiveness in building synergy in terms of regional development in accordance with the mandate of the law on national development planning, namely in accordance with Permendagri Number 86 of 2017. Kendal Regency Facilitation Process by the Central Java provincial government those that have been implemented well will produce legal products that are able to explain the central government's development programs and there will not be problems in the future. The problems of Regional Development Planning, which have been carried out by the Central Java provincial government, are still much sought to be in accordance with the conditions and needs and well implemented in accordance with the laws and regulations, the need for a better solution to avoid future problems ; Time problems that are less effective, and so that scheduling is done in great detail and in a short amount of time, to improve the performance and effectiveness of facilitation. Regarding the issuance of the Minutes is not quite right than the issuance of the Governor's Decree, the Javanese provincial government should be publishing the provisions of the results of facilitation that have been carried out.The Kendal Regency Government also seeks to ask the provincial government to establish a governor's decree so that it can form the basis of the legal umbrella of regional development planning, which is in accordance with the substance of the Minister of Home Affairs Regulation No. 86 of 2017, relating to the Regional Development planning process in Kendal District, which was previously in 2016 has been amended by the new regulation by referring to Permendagri regulation No. 86 of 2017, Kendal District Government seeks to ask the Governor of Central Java as the provincial government to provide facilitation that is in accordance with Kendal Regency characteristics, with reference to the effectiveness of the time given so that the bureaucracy that is built can be effective and efficient.Keywords: Facilitation, Juridical, Regional Development Planning