Petroleum and natural gas industries. Formulae and calculations for the properties of casing, tubing, drill pipe and line pipe used as casing or tubing

2021 ◽  
Keyword(s):  
Author(s):  
Toby Fore ◽  
Stefan Klein ◽  
Chris Yoxall ◽  
Stan Cone

Managing the threat of Stress Corrosion Cracking (SCC) in natural gas pipelines continues to be an area of focus for many operating companies with potentially susceptible pipelines. This paper describes the validation process of the high-resolution Electro-Magnetic Acoustical Transducer (EMAT) In-Line Inspection (ILI) technology for detection of SCC prior to scheduled pressure tests of inspected line pipe valve sections. The validation of the EMAT technology covered the application of high-resolution EMAT ILI and determining the Probability Of Detection (POD) and Identification (POI). The ILI verification process is in accordance to a API 1163 Level 3 validation. It is described in detail for 30″ and 36″ pipeline segments. Both segments are known to have an SCC history. Correlation of EMAT ILI calls to manual non-destructive measurements and destructively tested SCC samples lead to a comprehensive understanding of the capabilities of the EMAT technology and the associated process for managing the SCC threat. Based on the data gathered, the dimensional tool tolerances in terms of length and depth are derived.


Author(s):  
K. A. Widenmaier ◽  
A. B. Rothwell

The use of high strength, high design-factor pipe to transport natural gas requires the careful design and selection of pipeline materials. A primary material concern is the characterization and control of ductile fracture initiation and arrest. Impact toughness in the form of Charpy V-notch energies or drop-weight tear tests is usually specified in the design and purchase of line pipe in order to prevent large-scale fracture. While minimum values are prescribed in various codes, they may not offer sufficient protection in pipelines with high pressure, cold temperature, rich gas designs. The implications of the crack driving force arising from the gas decompression versus the resisting force of the pipe material and backfill are examined. The use and limitations of the Battelle two-curve method as the standard model are compared with new developments utilizing crack-tip opening angle and other techniques. The methodology and reasoning used to specify the material properties for line pipe are described and the inherent limits and risks are discussed. The applicability of Charpy energy to predict ductile arrest in high strength pipes (X80 and above) is examined.


Author(s):  
Bob Eiber ◽  
Lorne Carlson ◽  
Brian Leis

This paper reviews the fracture control plan for the Alliance Pipeline, which is planned for operation in 2000. This natural-gas pipeline is 2627 km (1858 miles) long, running from British Columbia, Canada to Illinois, USA. Interest in the fracture control for this pipeline results from its design, which is based on transporting a rich natural gas (up to 15% ethane, 3% propane) at a relatively high pressure 12,000 kPa (1740 psi). This break from traditional pressures and lean gases, which frequently are constrained by incremental expansion, is more efficient and more economical than previous natural gas pipelines. Use of higher pressures and rich gas requires adequate fracture control for the line pipe, fittings, and valves. This fracture control has been achieved for the Alliance Pipeline by specifying high-toughness steels, in terms of both fracture-initiation and fracture-propagation resistance for the line pipe, fittings and heavy wall components. While beneficial from an economics viewpoint, the need for higher toughnesses raised concern over the validity of the fracture control plan, which was based on existing and new technology. The concern focused on fracture arrest using high toughness steels. The concern was associated with characterizing fracture arrest resistance using Charpy V-notch impact toughness, the most commonly used method to measure fracture arrest resistance. Developments were undertaken to address problems associated with the use of higher-toughness steel and these were validated with full-scale pipe burst tests to demonstrate the viability of the fracture control plan. The solution involved extending existing methods to address much higher toughness steels, which provided a significantly improved correlation between fracture arrest predictions and experimental results. In the burst tests, data was collected to validate the Alliance design and also to extend the database of fracture arrest data to assist future pipelines. Data such as the pressure between the pipe and soil as the gas escapes from the pipe, the sound levels in the atmosphere, the movement and strains in the pipe ahead of the running fracture were instrumented in the test and the available results are presented.


Sign in / Sign up

Export Citation Format

Share Document