Metro Station Deformation Caused by Deep Foundation Pit Construction

2014 ◽  
Vol 580-583 ◽  
pp. 1061-1064
Author(s):  
Chun Lei Xin ◽  
Bo Gao

Many excavation and backfill methods can be used to construct a deep foundation pit, but foundation pit construction will undoubtedly affects security of existing metro station. This research based on a transfer station of Chengdu Metro, three-dimensional numerical simulation method was used to analyze the deformation of metro station by changing construction methods of foundation pit. The results show that: (1) Both excavation and backfill methods of foundation pit have a significant effect on connection segments of metro station. (2) The main body of metro station is largely unaffected by foundation pit construction but it has been in the process of subsidence. (3) The more the construction steps of foundation pit are, the more slowly the displacement of metro station changes. The above results certainly contribute to research and develop new types of construction methods for complicated metro station.

Geofluids ◽  
2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Zhongjing Hu ◽  
Qingbiao Wang ◽  
Shuo Yang ◽  
Zhenyue Shi ◽  
Bo Liu ◽  
...  

Advancing urbanization in China requires large-scale high-rise construction and underground transportation projects. Consequently, there is an increasing number of deep foundation pits adjacent to water bodies, and accidents occur frequently. This study uses a numerical simulation method to study the stability of the deep foundation pit near water based on the Biot three-dimensional seepage-stress coupling model, with the open-cut section on the south bank of the Jinan Yellow River Tunnel Project as the engineering field test. This indicates the following: (1) the maximum horizontal displacement of the diaphragm wall occurred in the fifth excavation stage, and a horizontal brace effectively controlled the inward horizontal displacement of the foundation pit; (2) considering the effect of seepage in the soft soil foundation, the maximum vertical displacement of the ground surface at each excavation stage occurred adjacent to the underground continuous wall. As the depth of the foundation pit increased, the vertical surface settlement decreases gradually in the direction away from the excavation face; (3) considering the seepage conditions, within each interval of excavation of the foundation pit, the horizontal displacement of the continuous underground wall and ground settlement declined; and (4) the numerical simulation and field monitoring data were in good agreement. Under the conditions of accurate model simplification and parameter selection, numerical simulations can adequately forecast conditions of the actual project.


2013 ◽  
Vol 443 ◽  
pp. 79-83
Author(s):  
Zhen Xi Yu

In recent years, with the enhancement of overall national strength in China, the computer simulation technology has been developed rapidly and widely applied to engineering construction. Particularly, investment proportion of the technology in deep foundation pit engineering is immense. Yet affected by national conditions in China, the construction and application of deep foundation pit engineering have many extensive factors. It also results in insufficient vigor of finite element analysis of deep foundation pit support construction. In this way, construction problems arise frequently under the condition that there exist buildings around. With some deep foundation pit support engineering, the thesis conducts simulation analysis of the engineering through the technology of nonlinear three-dimensional finite element.Project profile


2010 ◽  
Vol 114 (3-4) ◽  
pp. 251-260 ◽  
Author(s):  
Nianqing Zhou ◽  
Pieter A. Vermeer ◽  
Rongxiang Lou ◽  
Yiqun Tang ◽  
Simin Jiang

2014 ◽  
Vol 580-583 ◽  
pp. 787-790
Author(s):  
Hai Xia Sun ◽  
Ke Zhang ◽  
Si Li Chen

This article mainly expounds the importance of in-situ monitoring on the construction process of deep foundation pit. Taking the deep foundation pit of some Shenyang metro station for example, the deformation features of the supporting structure and the internal and external of foundation pit is analyzed, according to the monitoring data of the fender pile displacement during the excavation of deep foundation pit. The conclusion is obtained that the timely and accurate in-situ monitoring information is necessary to guaranteeing construction safety. We should pay more attention to the excavation speed and exert the interior support timely during the excavation of foundation pit to avoid large deformation and danger. The analytical results of monitoring data shows that the whole stage of foundation pit excavation is stable and the fender pile with internal supports can guarantee the stability of foundation pit.


2011 ◽  
Vol 243-249 ◽  
pp. 2338-2344
Author(s):  
Qing Yuan Li ◽  
Yang Wang

Taking deep excavation engineering in North Region of Senlin Park Station of Beijing Olympic Subway branch as engineering background, deformation law of enclosure structure of deep excavation are studied by the in-situ monitoring means .It shows that the maximum horizontal displacement of retaining pile is closely related with excavation depth and time. When the deep foundation pit is excavated to a certain depth, and steel brace hasn’t been erected, horizontal displacement of the pile tops is maximum. The location of the maximum horizontal displacement shifts down with foundation pit excavation and steel brace erection. With steel brace application, steel axis force decrease, so steel brace can effectively control horizontal displacements of retaining pile and internal force of steel in the pile. In addition, temperature has a certain effect to axis force of steel brace.


Sign in / Sign up

Export Citation Format

Share Document