power system operation
Recently Published Documents


TOTAL DOCUMENTS

550
(FIVE YEARS 126)

H-INDEX

28
(FIVE YEARS 5)

2022 ◽  
Vol 8 ◽  
pp. 217-238
Author(s):  
Ahmed A. Shehata ◽  
Mohamed A. Tolba ◽  
Ali M. El-Rifaie ◽  
Nikolay V. Korovkin

2022 ◽  
Vol 12 (2) ◽  
pp. 623
Author(s):  
Eman Ali ◽  
Ragab El-Sehiemy ◽  
Adel Abou El-Ela ◽  
Marcos Tostado-Véliz ◽  
Salah Kamel

Power system operation and planning studies face many challenges with increasing of renewable energy sources (RESs) penetration. These challenges revolve around the RESs uncertainty and its applications on probabilistic forecasting, power system operation optimization and power system planning. This paper proposes a novel and effective criterion for uncertainties modeling of the RESs as well as system loads. Four sorting stages are applied for the proposed uncertainty cases reduction. Added to that, it proposes three different uncertainty reduction strategies for obtaining different accuracy and speed options. The proposed reduction strategies are tested on medium and large scale distribution systems; IEEE 69-bus and 118-bus systems. The obtained results verify the effectiveness of the proposed criterion in uncertainties modeling in distribution systems with acceptable level of accuracy.


2021 ◽  
Author(s):  
Saif Rehman ◽  
Rahul Shukla ◽  
Aman Gautam ◽  
Arifur Kabir ◽  
Sharif Shamsul Alam ◽  
...  

2021 ◽  
Vol 12 (4) ◽  
pp. 263
Author(s):  
Jose David Alvarez Guerrero ◽  
Bikash Bhattarai ◽  
Rajendra Shrestha ◽  
Thomas L. Acker ◽  
Rafael Castro

The electrification of the transportation sector will increase the demand for electric power, potentially impacting the peak load and power system operations. A change such as this will be multifaceted. A power system production cost model (PCM) is a useful tool with which to analyze one of these facets, the operation of the power system. A PCM is a computer simulation that mimics power system operation, i.e., unit commitment, economic dispatch, reserves, etc. To understand how electric vehicles (EVs) will affect power system operation, it is necessary to create models that describe how EVs interact with power system operations that are suitable for use in a PCM. In this work, EV charging data from the EV Project, reported by the Idaho National Laboratory, were used to create scalable, statistical models of EV charging load profiles suitable for incorporation into a PCM. Models of EV loads were created for uncoordinated and coordinated charging. Uncoordinated charging load represents the load resulting from EV owners that charge at times of their choosing. To create an uncoordinated charging load profile, the parameters of importance are the number of vehicles, charger type, battery capacity, availability for charging, and battery beginning and ending states of charge. Coordinated charging is where EVs are charged via an “aggregator” that interacts with a power system operator to schedule EV charging at times that either minimize system operating costs, decrease EV charging costs, or both, while meeting the daily EV charging requirements subject to the EV owners’ charging constraints. Beta distributions were found to be the most appropriate distribution for statistically modeling the initial and final state of charge (SoC) of vehicles in an EV fleet. A Monte Carlo technique was implemented by sampling the charging parameters of importance to create an uncoordinated charging load time series. Coordinated charging was modeled as a controllable load within the PCM to represent the influence of the EV fleet on the system’s electricity price. The charging models were integrated as EV loads in a simple 5-bus system to demonstrate their usefulness. Polaris Systems Optimization’s PCM power system optimizer (PSO) was employed to show the effect of the EVs on one day of operation in the 5-bus power system, yielding interesting and valid results and showing the effectiveness of the charging models.


2021 ◽  
Vol 11 (24) ◽  
pp. 11806
Author(s):  
Peter Kitak ◽  
Lovro Belak ◽  
Jože Pihler ◽  
Janez Ribič

The paper deals with the reliability-centered maintenance (RCM) of a transmission substation. The process of the planning and actual performance of maintenance was carried out using an optimization algorithm. This maintenance procedure represents the maintenance management and included reliability of the power system operation, maintenance costs, and associated risks. The originality of the paper lies in the integrated treatment of all maintenance processes that are included in the pre-processing and used in the optimization process for reliability-centered maintenance. The optimization algorithm of transmission substation maintenance was tested in practice on the equipment and components of an existing 400/110–220/110 kV substation in the Slovenian electricity transmission system. A comparison analysis was also carried out of the past time-based maintenance (TBM) and the new reliability-centered maintenance (RCM), on the basis of the optimization algorithm.


2021 ◽  
Author(s):  
Tong Liu ◽  
Ruizeng Wei ◽  
Lei Wang ◽  
Enze Zhou ◽  
Hui Hou

Author(s):  
Ricardo Moreno ◽  
Diego Larrahondo ◽  
Oscar Florez

The energy transition from fossil-fuel generators to renewable energies represents a paramount challenge. This is mainly due to the uncertainty and unpredictability associated with renewable resources. A greater flexibility is requested for power system operation to fulfill demand requirements considering security and economic restrictions. In particular, the use of gas-fired generators has increased to enhance system flexibility in response to the integration of renewable energy sources. This paper provides a comprehensive formulation for modeling a natural gas supply network to provide gas for thermal generators, considering the use of wind power sources for the operation of the electrical system over a 24-hour period. The results indicate the requirements of gas with different wind power level of integration. The model is evaluated on a network of 20 NG nodes and on a 24-bus IEEE RTS system with various operative settings during a 24-hour period.


Sign in / Sign up

Export Citation Format

Share Document