synthetical evaluation
Recently Published Documents


TOTAL DOCUMENTS

22
(FIVE YEARS 1)

H-INDEX

2
(FIVE YEARS 0)

2021 ◽  
Vol 276 ◽  
pp. 122219
Author(s):  
Xinxin Ding ◽  
Minglei Zhao ◽  
Changyong Li ◽  
Jie Li ◽  
Xusheng Zhao

2017 ◽  
Vol 42 (32) ◽  
pp. 20857-20867 ◽  
Author(s):  
Aijun Li ◽  
Zhen Chen ◽  
Yuhan Liao ◽  
Yuhao Liu

2014 ◽  
Vol 1049-1050 ◽  
pp. 573-577
Author(s):  
Zhi Peng Yao

In consideration of the generated energy per unit area as large as possible and the expense of generated energy per unit as low as possible, this paper has proposed optimization selection method for the types of solar panels about six surfaces of the single house which receive solar radiation,the solar panels series and parallel connection and the invertors. The final laying scheme has been obtained through the synthetical evaluation of the optimization results about six surfaces .


2014 ◽  
Vol 889-890 ◽  
pp. 1203-1206
Author(s):  
Ji Guo Dong ◽  
Jian Ping Cai

In this paper, the synthetical evaluation model based on integer programming for arrangement of single round robin schedule is established through analyzing the major factors of matches. Following, as an example, we analysis and evaluate the schedule of NBA 08-09 season according to this mathematical mode. All results are obtained with the MATLAB software.


2014 ◽  
Vol 501-504 ◽  
pp. 1727-1731
Author(s):  
Zong Yang Li ◽  
Yu Han Feng ◽  
Zong Liang Li

Depended on the fact that so many plans for tunnel design laid much emphasis on its construction process and its short-term cost while ignored the increasing importance of environment now, this article puts forward a synthetical method contains analytic hierarchy process and fuzzy mathematics to evaluate plans for tunnel design with certain indexes including the volume of earth works, carbon emissions, energy consumption and consumption of materials, all of which were taken from the main procedures of the tunnel constrution. In the synthetical evaluation process, the performance on environment of a construction plan was graded into four levels, after the probabilities of four indexes may have on each level was obtained, often by investigation or experience, the final scores of the designs could be calculated with the fuzzy probability method. Further, the designs could be compared.


Sign in / Sign up

Export Citation Format

Share Document