Research on Production Scheduling Method and the Application in Switch Machine Production Enterprise

2012 ◽  
Vol 190-191 ◽  
pp. 156-159
Author(s):  
Jian Qing Chen

This paper is under the research background of a switch machine production enterprise informatization projects, and the production schedule is mainly based on customer orders and sales forecasts. This paper mainly studies the combination of similar order processing sheets according to the similarity of types and specifications of products in an order processing sheet, and the experience of master production scheduling personnel, to generate the master production scheduling methods and techniques. Finally, studies the material requirements planning methods based on nested components, focusing on the configuration of parts and components of such products in the product configuration.

Heuristic ◽  
2016 ◽  
Vol 12 (02) ◽  
Author(s):  
Yusuf Eko Nurcahyo

The fluctuated demand is one of constrain in planning and scheduling process because it affects the cost of production and inventory costs incurred. PT "X" is a sandal maker manufacturing industry that produces sandals and slippers men women. In the manufacture of slippers companies often do not correspond to the amount of consumer demand, so common advantages and disadvantages of production quantities. Master production scheduling (MPS) is a solution to overcome the problem of making sandals to avoid excess and shortage of production of slippers. To create a Master Production Schedule first made a forecast for the next planning period is 5 months of January, February, March, April, May and June.Keyword: Master Production Schedule, linier programming


Author(s):  
Rosnani Ginting ◽  
Chairul Rahmadsyah Manik

Penjadwalan merupakan aspek yang sangat penting karena didalamnya terdapat elemen perencanaan dan pengendalian produksi bagi suatu perusahaan yang dapat mengirim barang sesuai dengan waktu yang telah ditentukan, untuk memperoleh waktu total penyelesaian yang minimum. Masalah utama yang dihadapi oleh PT. ML adalah keterlambatan penyelesaian order yang mempengaruhi delivery time ke tangan costumer karena pelaksanaan penjadwalan produksi dilantai pabrik belum menghasilkan makespan yang sesuai dengan order yang ada. Oleh kaena itu dituntut untuk mencari solusi pemecahan masalah optimal dalam penentuan jadwal produksi untuk meminimisasi total waktu penyelessaian (makespan) semua order. Dalam penelitian ini, penjadwalan menggunakan metode Simulated Annealing (SA) diharapkan dapat menghasilkan waktu total penyelesaian lebih cepat dari penjadwalan yang ada pada perusahaan.   Scheduling is a very important aspect because in it there are elements of planning and production control for a company that can send goods in accordance with a predetermined time, to obtain a minimum total time of completion. The main problem faced by PT. ML is the delay in completing orders that affect delivery time to customer because the implementation of production scheduling on the factory floor has not produced the makespan that matches the existing order. Therefore, it is required to find optimal problem solving solutions in determining the production schedule to minimize the total time of elimination (makespan) of all orders. In this study, scheduling using the Simulated Annealing (SA) method is expected to produce a total time of completion faster than the existing scheduling in the company.


2020 ◽  
Vol 2020 (0) ◽  
pp. S14202
Author(s):  
Takeru DOAN ◽  
Satoshi NAGAHARA ◽  
Takafumi CHIDA ◽  
Junichi KATSUBE ◽  
Tooru ADACHI ◽  
...  

2014 ◽  
Vol 889-890 ◽  
pp. 1207-1212
Author(s):  
Guo En Sun ◽  
Zai Lin Guan ◽  
Lei Yue ◽  
Zhi Ming Zheng ◽  
Han Lin

Traditional planning methods ignore the enterprise production capacity,the paper depend on the specific case in enterprise production to build a Production Scheduling System which applies Drum-Buffer-Rope theory. This system proposes the high output, low work in process and on time delivery as the goals, considering the bottleneck resource as well as providing the master production plan with the bottleneck resource, in addition employing the simulation optimization software-Simio to optimize the bottleneck process scheduling and raise the utilization ratio of bottleneck resource.