IJTI (International Journal Of Transportation And Infrastructure)
Latest Publications


TOTAL DOCUMENTS

41
(FIVE YEARS 28)

H-INDEX

1
(FIVE YEARS 0)

Published By Narotama University

2597-4769, 2597-4734

Author(s):  
Sandri Adianto ◽  
Sri Wiwoho Mudjanarko
Keyword(s):  

Author(s):  
Ido Prasetio ◽  
Andri Irfan Rifai

Increasing the number of population and the development of activities will cause a growing need for space every day, this will result in physical changes and urban land use and can cause increased intensity of population movement from Megapolitan cities such as Bekasi, Bogor and Tangerang to the Metropolitan city (DKI Jakarta). Some people have now started to move from private vehicles to use public (mass) transportation such as buses, transjakarta, and electric rail trains or commonly known as KRL Commuter Line that serve Jabodetabek routes. The impact of crossing also causes buildup at each station. Train track with a single track (single track) is considered ineffective and inefficient and vulnerable to train accidents due to human error. It is necessary to develop or develop a double track to become a double-double track Bekasi Station km 26 + 652 - Jatinegara Station km 12 + 050. The research location is on the railway line from Bekasi Station to Jatinegara Station. The length of the train track is around 16 km and has 7 stations that are traversed, 5 of which are active (stop) and 2 passive stations.


Author(s):  
Amar Mufhidin ◽  
Eviani Subiastuti

The kalimalang highway is a connecting road between the city of Jakarta and Bekasi, the high mobility of passenger vehicles and goods is a problem of congestion that must be minimized. The volume of vehicles on the Kalimalang highway has increased quite high each year, but this has not been matched by growth in capacity. Therefore the government plants to build the Becakayu toll road to reduce congestion. This study aims to determine bottlenecks that occur due to the construction of an off-ramp on the Becakayu toll road, especially in section 2A, which is located on Jl. Veteran, while the location under review is the intersections affected by the construction of the off-ramp including the intersection of four signaling BCP, intersection of four signaling Veteran and Sarbini unsigned intersection, Data analysis in this study uses the MKJI 1997 method.  From this method displays the behavior of traffic, for signal intersections will display signal time, capacity, vehicle stopped ratio, queue length, and average delay and for unsignalized intersections will display capacity, average delay and queue opportunity. From the results of this study it was found that the signaled intersection had an average value of DS > 1, so for the service level at the intersection is the current forced / jammed with low speed. Where the largest queue length occurred 1876.7 m, an average delay of 210.30 SMP/ sec, and vehicles stopped at an average of 7378 SMP/hour. And for unsignalized intersections having an average DS <0.45, the service level at the intersection is a stable flow with operating speed starting to be limited by traffic conditions, this intersection has the greatest queue probability (QP%) 8.48-20.35 in the Saturday time period - afternoon and intersection delay 9.5 SMP / sec.


Author(s):  
Jantiara Eka Nandiasa ◽  
Ridwan Adi Sanjaya

Drainage can be generally defined as a technical measure to reduce excess water, whether from rain, seepage, or excess irrigation water from an area / land, so that the function of the area / land is not disturbed. This study aims to analyze, assess and evaluate the condition and capacity of the channel in the sub-district Pabuaran Road Bogor Cibinong District to discharge the flooding. Data and information used is primary data in the form of rainfall data from the Meteorology and Geophysics from the nearest irrigation hall as well as secondary data, the authors survey directly at the sites. In the flood discharge processing method using two methods of hydrograph Unit hydrograph Unit Synthetic Synthetic Nakayasu and ITB. The results of both methods is used the largest flood discharge. Getting the design flood discharge using Synthetic Unit Hydrograph ITB on Channel A of 6,434 m3 / sec. Analysis of the results of the calculation of the existing discharge chute, the discharge contained on Channel A of 2.10 m3 / sec and Channel B amounting to 0.21 m3 / sec limpas both channels experience. Alternative solutions to the problems that limpas channel or unsafe they are planning a new dimension channel.


Author(s):  
Sapto Budi Wasono ◽  
M Zusron Anggik

Traffic jams often occur in the city of Surabaya. Due to the increasing population and the desire to have private vehicles, this has led to the need for adequate additional road capacity. However, the frequent increase in road capacity is not enough with the very high growth of road users. Therefore, the Surabaya city government planned an alternative route to reduce the congestion that occurred, one of which was building a rapid mass transportation, the tram, the construction of the tram itself was still in the planning stage, requiring a study of the influence of operational plans on public interest in trams, specifically for motorcyclists. What factors can make motorbike riders divert to the tram. One way to find out how much interest motorbike riders have is to use multiple linear regression methods which require data from road users. Questionnaires are needed to retrieve data and collect samples consisting of 200 respondents. In this study the location of the deployment is in the area that trams are going to plan for, starting from Joyoboo - Jl.Raya Darmo - Urip Sumoharjo - Jl.Basuki Rahmat - Jl.Embong Malang - Jl.Blauran - Jl.Bubutan - Tugu Pahlawan - Jl. Indrapura - Jl. Rajawali. While going south will pass Jl. Heroes - Jl. Gemblongan - Jl, Tunjungan - Jl. Governor Suryo - Jl. Panglima Sudirman - Jl. Urip Sumoharjo - Jl. Raya Darmo - Terminal Joyoboyo


Author(s):  
Muhammad Isradi ◽  
Enif Asfarianto Pratama

Intersection Telkom Jatiasih is one of the congestion point in Bekasi City. This is at leave because of the high volume of traffic and also a busy route from Bekasi to Jakarta and the surrounding area, plus the direction to the toll gate Jatiasih. There is no sign – traffic sign making of Intersection Telkom Jatiasih is an unsignable junction, this is what causes the flow of irregular vehicles causing congestion. The data retrieval method is done by surveying directly to the research site. Based on survey result in Telkom Jatiasih intersection, the highest vehicle volume accurred in the afternoon of Monday, April 29 th, 2019. Calculated results based on the field survey result data using the MKJI 1997 book guidelines, obtaining the Degree of Saturation (DS) = 1,86 with the Level Of Service F value, indicating the stopping of the vehicle current at the congestion point such as the meeting path, or repair lanes that cause a long queue of vehicles. On the road Of Wibawa Mukti II Highway – Jatiasihi the vehicle flows are still recorded stably with the Degree of Saturation (DS) = 1,16 with a Level Of Service F value which means the level of road service is still stable. From the research results get an alternative solution Telkom Jatiasih intersection is in alternative 2 because it gets a decrease in the Degree of Saturation (DS) = 1,11 with the value of the Level Of Service F which means high traffic flow condition, but Current conditions are still stable.


Author(s):  
Sistu Wilujeng ◽  
Florianus Rooslan Edy Santosa
Keyword(s):  

Author(s):  
Agung Sumarno ◽  
Syafwandi Syafwandi ◽  
Fatmawati Adelia Rizky ◽  
Sumiyati Sumiyati

Concrete is a mixture of Portland cement or other hydraulic cement, fine aggregate, coarse aggregate, and water, with or without additives (admixture). The naphthalene superplasticizer used comes from distillation of coal tar and a little from the rest of petroleum, but there is also camphor naphthalene. Where camphor grains contain 250-500 mg of naphthalene. Naphthalene is mostly produced from coal tar distillation, and a little from the rest of the fractionation of petroleum, by the molecular formula (C10H8) and in the form of two unified benzene rings. This compound is volatile, volatile even in the form of solids. The vapor produced is flammable. The purpose of this study was to determine the effect of the use of naphthalene from coal tar waste with camphor naphthalene as concrete admixture, and determine the effect of naphthalene from coal tar waste with camphor naphthalene on concrete toughness, density, water absorption, of concrete compressive strength. It is expected that the use of naphthalene can reduce the use of cement, and reduce water use. But it does not reduce the strength of the concrete so as to reduce costs in making concrete. The variations in the use of camphor naphthalene and coal tar naphthalene are 20%, 30%, 40%.


Author(s):  
Fahreza Fahreza ◽  
Muhammad Rifqi

Network Monitoring System (NMS) is a system that is highly demanded internet service provider industry in this fast-developing information technology era. The availability of NMS is the best option to restore the service level agreement as a means to compete with other internet service providers’ competitors. The occurrence of disturbance in the network is often unnoticed by the network administrator. This may lead to a crucial problem in decreasing network quality as the impact of time-consuming in solving the problem. Through the explanation, the writer tried to anticipate by classifying problems using Pareto, and integrated Nagios with Telegram Messenger as a notification of disturbance. Nagios has many features such as reports, event handler, monitoring resource (CPU load, memory usage, status up / down, up time, data traffic, bandwidth), etc. One of notable feature owned by Nagios is blast notification of disturbance. It is a feature that will function when one of the devices is in trouble. This feature will inform the network administrator or authorized person in a certain divisions as regards the error network. In this case, the problematic device can be categorized according to the parameters made by the network administrator.


Author(s):  
Essen Donald ◽  
Dwi Pratama Andreas

reciprocating engine consists of two driving parts, piston and rotor, when the engine start these two parts move with a certain frequency, resulting in vibrations in the structure. dynamic analysis of the structure aim to find out how the structure behaves due to vibrations generated from the machine, whether the structure is safe for the machine and humans around the machine due to the amplitude of displacement, velocity, and displacement from structure. This dynamic analysis is carried out with the help of SAP 2000 v20.20 software with a dynamic load in the form of a reciprocating compressor operating with a frequency of 49.16 Hz. In this final project, the machine foundation uses a table top type with 1x1.7 m column dimensions and 1.3x1.6 m beams. From the free vibration analysis, the result is a natural frequency structure, from the first ten modes the structure is declared safe from resonance However, in this study the displacement and velocity of structures that occur in the zone B & C while the acceleration into the safe category based on applicable standards. This means that the structure is safe for humans who are around but are not safe for the product and the machine itself if it operates for a long time continuously.


Sign in / Sign up

Export Citation Format

Share Document